|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 3/27/2025 Measured TD: 8620 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 3/27/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 12/3/2011 | | Proposed Depth/Form: | 8602 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: NE/4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1110 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 1110 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8602 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 7390 ft., Bottom: 8602 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5314 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 170, Top: 4615 ft., Bottom: 5314 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/19/2010 | | Spud Date: | 12/14/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8620 ft. | Measured PB depth: | 8551 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1224 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 1224 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8606 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 707, Top: 3850 ft., Bottom: 8606 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4815 ft. | | | | | NIOBRARA | 7590 ft. | | | | | CODELL | 8008 ft. | | | | | J SAND | 8448 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 3/27/2025 Interval Top: 8448 ft. Interval Bottom: 8466 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/12/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/12/2011 | | Treatment Summary: | J SAND COMPLETION.
FRAC'D THE J-SAND FROM 154,266 GAL 19 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,120 # 20/40 SAND. 01/12/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8448 ft. | # Of Holes: | 36 | | Interval Bottom: | 8466 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 2/5/2025 Interval Top: 8008 ft. Interval Bottom: 8026 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8008 ft. | # Of Holes: | 99 | | Interval Bottom: | 8026 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/8/2011 Interval Top: 7590 ft. Interval Bottom: 8466 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/8/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SET CBP @ 7550'. 01/3011. DRILLED OUT CBP @ 7550'. CFP @ 8100', 7890' TO COMMINGLE THE JSND-CDL-NBRR. 02/03/11. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8417 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/8/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 75 | | BBLS_OIL | 42 | | BTU_GAS | 1212 | | CALC_BBLS_H2O | 75 | | CALC_BBLS_OIL | 42 | | CALC_GOR | 5119 | | CALC_MCF_GAS | 215 | | CASING_PRESS | 1809 | | GRAVITY_OIL | 52 | | MCF_GAS | 215 | | TUBING_PRESS | 817 |
| | Perforation Data: | | Interval Top: | 7590 ft. | # Of Holes: | 224 | | Interval Bottom: | 8466 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/27/2025 Interval Top: 7590 ft. Interval Bottom: 8026 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/12/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/12/2011 | | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 8100'. 01/12/2011. FRAC'D THE CODELL WITH 110,248 GAL 22 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,020 # 20/40 SAND. 01/12/11. SET CFP @ 7890'. 01/12/11. FRAC'D THE NIOBRARA WITH 130,200 GALS 18 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,020 # 20/40 SAND 01/12/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7590 ft. | # Of Holes: | 188 | | Interval Bottom: | 8026 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 2/5/2025 Interval Top: 7590 ft. Interval Bottom: 7796 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7590 ft. | # Of Holes: | 89 | | Interval Bottom: | 7796 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/27/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|