|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/1/2024 Measured TD: 8498 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/1/2024 | Wellbore Permit | | Permit #: | | Expiration Date: | 2/29/2012 | Proposed Depth/Form: | 8467 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1150 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 320, Top: 0 ft., Bottom: 1150 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8467 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 320, Top: 7261 ft., Bottom: 8467 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5589 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 230, Top: 4619 ft., Bottom: 5589 ft. |
| | |
Wellbore Completed | Completion Date: | 9/30/2010 | Spud Date: | 9/24/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8498 ft. | Measured PB depth: | 8466 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL, | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1182 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 429, Top: 0 ft., Bottom: 1182 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8487 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 595, Top: 5000 ft., Bottom: 8487 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 3646 ft., Depth: , Bottom: 4764 ft., Sacks: 160, Method: | Additional Cement: | String Type: 1ST , Top: 1150 ft., Depth: , Bottom: 1550 ft., Sacks: 202, Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4746 ft. | | | | NIOBRARA | 7546 ft. | | | | CODELL | 7876 ft. | | | | J SAND | 8328 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 8/1/2024 Interval Top: 8328 ft. Interval Bottom: 8342 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 10/14/2010 | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J SAND WITH 159,096 GAL 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,680# 20/40 SAND. 10/14/2010. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8328 ft. | # Of Holes: | 28 | Interval Bottom: | 8342 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/26/2010 Interval Top: 7526 ft. Interval Bottom: 8342 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 10/14/2010 | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SET CPB @ 7460'. 10/21/10. DRILLED OUT CBP @ 7460', CFP @ 7760' AND 7970' TO COMMINGLE THE JSND-NBRR-CDL. 10/22/2010. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8315 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/26/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 169 | BBLS_OIL | 148 | BTU_GAS | 1169 | CALC_BBLS_H2O | 169 | CALC_BBLS_OIL | 148 | CALC_GOR | 3257 | CALC_MCF_GAS | 482 | CASING_PRESS | 1980 | GRAVITY_OIL | 53 | MCF_GAS | 482 | TUBING_PRESS | 964 |
| Perforation Data: | Interval Top: | 7526 ft. | # Of Holes: | 208 | Interval Bottom: | 8342 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 8/1/2024 Interval Top: 7526 ft. Interval Bottom: 7894 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 10/14/2010 | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 7970'. 10/14/2010. FRAC'D THE CODELL WITH 111,342 GAL 22 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,660# 30/50 SAND. 10/14/2010. SET CFP @ 7760'. 10/14/2010. FRAC'D THE NIOBRARA WITH 128,268 GALS 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,860# 30/50 SAND. 10/15/2010. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7526 ft. | # Of Holes: | 180 | Interval Bottom: | 7894 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 661 |
Total Gas Produced (MCF) | 3482 |
GOR | 5267 |
GOR Determination | BOE |
Average BOE per Day | 3.472 |
Average MCFE per Day | 20.140 |
Federal Financial Assurance | i | |
|
|