|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/6/2021 Measured TD: 8822 ft. Vertical TD: 8604 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/6/2021 | Wellbore Permit | DIRECTIONAL | Permit #: | 20075608 | Expiration Date: | 2/6/2009 | Proposed Top PZ Location: | Sec:34 Twp: 1N 68W | Footage: 1299 FNL 56 FEL | Bottom Hole Location: | Sec:34 Twp: 1N 68W | Footage: 1299 FNL 56 FEL | Proposed Depth/Form: | 8898 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5929 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 250, Top: 4866 ft., Bottom: 5929 ft. |
| | |
Wellbore Completed | Completion Date: | 7/28/2008 | Spud Date: | 7/22/2008 | Spud Date Is: | ACTUAL | Measured TD: | 8822 ft. | Measured PB depth: | 8744 ft. | True Vertical TD: | 8604 ft. | True Vertical PB depth: | 8526 ft. | Top PZ Location: | Sec:34 Twp: 1N 68W | Footage: 1299 FNL 56 FEL | Bottom Hole Location: | Sec:34 Twp: 1N 68W | Footage: 1299 N 56 E | Log Types: | CBL, DUAL IND/COMP DENSITY/COMP NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1081 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 480, Top: 0 ft., Bottom: 1081 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8806 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 290, Top: 7160 ft., Bottom: 8806 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5605 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 230, Top: 4430 ft., Bottom: 5605 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5605 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 230, Top: 4432 ft., Bottom: 5640 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 5036 ft. | | N | N | SHANNON | 5758 ft. | | N | N | NIOBRARA | 7764 ft. | | N | N | CODELL | 8207 ft. | | N | N | J SAND | 8634 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/6/2021 Interval Top: 8650 ft. Interval Bottom: 8662 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/9/2008 | Treatment Summary: | JSND COMPLETION. FRAC'D THE J SAND WITH 153636 GAL 20 VISTAR HYBRID CROSS LINKED GEL CONTAING 250400 SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8650 ft. | # Of Holes: | 24 | Interval Bottom: | 8662 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 8/11/2021 Interval Top: 8208 ft. Interval Bottom: 8224 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 7/25/2012 | Treatment End Date: | 7/25/2012 | Treatment Summary: | 4596 bbls of water, 16 bbls of additives (GW-45LF, GBW-21, HighPerm CRB, BC-3, BF-9L, ClayCare, XLW-14, XLW-22C, FRW-20, NE-945, Flo-Back 40, BioClear 1000) and 0 bbl HCL in a 1 stage frac with 125020 lbs of silica quartz proppant
| Total fluid used in treatment (bbls): | 4569 | Max pressure during treatment (psi): | 3542 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.77 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 4569 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 125340 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8208 ft. | # Of Holes: | 64 | Interval Bottom: | 8224 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/1/2008 Interval Top: 7956 ft. Interval Bottom: 8662 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/28/2008 | Treatment Summary: | JSND-NB-CD COMMINGLE. DRILLED OUT CFP @ 8070', 9/23/08. DRILLED OUT CFP @ 8350' TO COMMINGLE THE JSND-NB-CD. 09/24/08 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8620 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/1/2008 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 295 | BBLS_OIL | 94 | BTU_GAS | 1000 | CALC_BBLS_H2O | 295 | CALC_BBLS_OIL | 94 | CALC_GOR | 5883 | CALC_MCF_GAS | 553 | CASING_PRESS | 1674 | GRAVITY_OIL | 48 | MCF_GAS | 553 | TUBING_PRESS | 963 |
| Perforation Data: | Interval Top: | 7956 ft. | # Of Holes: | 120 | Interval Bottom: | 8662 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/6/2021 Interval Top: 7956 ft. Interval Bottom: 8224 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/9/2008 | Treatment Summary: | NBRR-CDL RECOMPLETION. SET CFP@ 8350. 9/9/08. FRAC'D THE CODELL WITH 109158 GAL 24 VISTAR HYBRID CROSS LINKED GEL CONTAINING 250000 SAND. 9/9/08. SET CFP@ 8070. 9/9/08. FRAC'D THE NIOBRARA WITH 141792 GAL 18 VISTAR CROSS LINKED GEL HYBRID CONTIANING 24966 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/14/2008 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 160 | BBLS_OIL | 40 | BTU_GAS | 1000 | CALC_BBLS_H2O | 160 | CALC_BBLS_OIL | 40 | CALC_GOR | 5700 | CALC_MCF_GAS | 228 | CASING_PRESS | 548 | GRAVITY_OIL | 48 | MCF_GAS | 228 |
| Perforation Data: | Interval Top: | 7956 ft. | # Of Holes: | 96 | Interval Bottom: | 8224 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/11/2021 Interval Top: 7956 ft. Interval Bottom: 7972 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/13/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 8/1/2012 | Treatment End Date: | 8/1/2012 | Treatment Summary: | 4960 bbls of water, 9 bbls of additives (GBW-5, ClayCare, FRW-20, NE-945, Flo-Back 40, BioClear 1000) and 0 bbl HCL in a stage frac with 165560 lbs of silica quartz proppant
| Total fluid used in treatment (bbls): | 4969 | Max pressure during treatment (psi): | 4256 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.82 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 4969 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 165560 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7956 ft. | # Of Holes: | 20 | Interval Bottom: | 7972 ft. | Hole Size: | 0.71 in. |
|
|
|
|
|
Reported Plugged | Y | 01/06/2021 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|