|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/4/2021 Measured TD: 8648 ft. Vertical TD: 8641 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/4/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20075536 | Expiration Date: | 11/27/2008 | | Proposed Top PZ Location: | Sec:34 Twp: 1N 68W | Footage: 2599 FSL 2578 FWL | | Bottom Hole Location: | Sec:34 Twp: 1N 68W | Footage: 2599 FSL 2578 FWL | | Proposed Depth/Form: | 8633 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407, 407-6, Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5671 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4641 ft., Bottom: 5671 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/19/2008 | | Spud Date: | 8/12/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8648 ft. | Measured PB depth: | 8574 ft. | | True Vertical TD: | 8641 ft. | True Vertical PB depth: | 8567 ft. | | Top PZ Location: | Sec:34 Twp: 1N 68W | Footage: 2599 FSL 2578 FWL | | Bottom Hole Location: | Sec:34 Twp: 1N 68W | Footage: 2599 FSL 2578 FWL | | Log Types: | CBL,DUAL IND/COMP.DENSITY/COMP.NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1099 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 0 ft., Bottom: 1099 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8623 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 7020 ft., Bottom: 8623 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8623 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 7020 ft., Bottom: 8623 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5425 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 4175 ft., Bottom: 5425 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4780 ft. | | N | N | | NIOBRARA | 7570 ft. | | N | N | | CODELL | 8022 ft. | | N | N | | J SAND | 8452 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/4/2021 Interval Top: 8466 ft. Interval Bottom: 8482 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/7/2008 | | Treatment Summary: | JSND COMPLETION. FRAC'D JSND W/156,742 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,660# SAND. 10/7/08 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8466 ft. | # Of Holes: | 32 | | Interval Bottom: | 8482 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: GW Status: CM - 8/11/2021 Interval Top: 8022 ft. Interval Bottom: 8040 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/5/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 7/23/2012 | Treatment End Date: | 7/23/2012 | | Treatment Summary: | 2894 bbls of water, 18 bbls of additives (GW-45LF, GBW-21, GBW-5, HighPerm CRB, BC-3, BF-9L, ClayCare, XLW-14, XLW-22C, FRW-20, NE-945, Flo-Back 40, BioClear 1000) and 0 bbl HCL in a 1 stage frac with 251240 lbs of silica quartz proppant
| | Total fluid used in treatment (bbls): | 2912 | Max pressure during treatment (psi): | 3421 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.33 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 2912 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 251240 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8022 ft. | # Of Holes: | 72 | | Interval Bottom: | 8040 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 11/8/2008 Interval Top: 7770 ft. Interval Bottom: 8482 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/19/2008 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE; DRILLED OUT CFP @ 7920 AND 8180 TO COMMINGLE THE JSND-NBRR-CDL. 10/18/08 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8428 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/8/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 56 | | BBLS_OIL | 56 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 56 | | CALC_BBLS_OIL | 56 | | CALC_GOR | 6911 | | CALC_MCF_GAS | 387 | | CASING_PRESS | 1160 | | GRAVITY_OIL | 47 | | MCF_GAS | 387 | | TUBING_PRESS | 580 |
| | Perforation Data: | | Interval Top: | 7770 ft. | # Of Holes: | 136 | | Interval Bottom: | 8482 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/4/2021 Interval Top: 7770 ft. Interval Bottom: 8040 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/7/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/7/2008 | | Treatment Summary: | NB-CD RECOMPLETION. SET CFP @8180', FRAC'D CD W/109,620 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,320# SAND. SET CFP @87920', FRAC'D NB W/141,078 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 252,320# SAND. 10/7/08 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/17/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 117 | | BBLS_OIL | 114 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 117 | | CALC_BBLS_OIL | 114 | | CALC_GOR | 3342 | | CALC_MCF_GAS | 381 | | CASING_PRESS | 928 | | GRAVITY_OIL | 47 | | MCF_GAS | 381 |
| | Perforation Data: | | Interval Top: | 7770 ft. | # Of Holes: | 104 | | Interval Bottom: | 8040 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/11/2021 Interval Top: 7770 ft. Interval Bottom: 7786 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/5/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 7/30/2012 | Treatment End Date: | 7/30/2012 | | Treatment Summary: | 3322 bbls of water, 21 bbls of additives (GW-45LF, GBW-21, GBW-5, HighPerm CRB, BC-3, BF-9L, ClayCare, XLW-14, XLW-22C, FRW-20, NE-945, Flo-Back 40, BioClear 1000) and 0 bbl HCL in a 1 stage frac with 250760 lbs of silica quartz proppant
| | Total fluid used in treatment (bbls): | 3343 | Max pressure during treatment (psi): | 4309 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.79 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 3343 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 250760 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7770 ft. | # Of Holes: | 32 | | Interval Bottom: | 7786 ft. | Hole Size: | 0.71 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/04/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|