Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20646
Well Classification: GW Status: PA - 2/4/2021
Well Name/No:BICKLER #23-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/4/2021
FacilityID:293771LocationID:335860
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NESW 34 1N68W 6
Field:WATTENBERG - #90750Elevation:5171 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2426FSL  2412 FWLLat/Long: 40.006970 / -104.990480Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.006980 / -104.990500Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/1/2012
End Date: 8/1/2012
Reported: 10/11/2012
Days to report: 71
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 2/4/2021             Measured TD: 8655 ft.    Vertical TD: 8607 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 2/4/2021
Wellbore PermitDIRECTIONAL
Permit #:20075534 Expiration Date:11/27/2008
Proposed Top PZ Location:Sec:34 Twp: 1N 68W Footage: 1997 FSL  1812 FWL
Bottom Hole Location:Sec:34 Twp: 1N 68W Footage: 1997 FSL  1812 FWL
Proposed Depth/Form:8647 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407, 407-6, Unit Acreage: 320, Drill Unit: W/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: W/2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5700 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4643 ft., Bottom: 5700 ft.

Wellbore Completed
Completion Date:8/27/2008
Spud Date:8/20/2008Spud Date Is:ACTUAL
Measured TD:8655 ft.Measured PB depth:8606 ft.
True Vertical TD:8607 ft.True Vertical PB depth:8558 ft.
Top PZ Location:Sec:34 Twp: 1N 68WFootage: 1997 FSL  1812 FWL
Bottom Hole Location:Sec:34 Twp: 1N 68WFootage: 1997 FSL  1812 FWL
Log Types:CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1108 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 460, Top: 0 ft., Bottom: 1108 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8642 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 6970 ft., Bottom: 8642 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8642 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 6970 ft., Bottom: 8642 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5478 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 4320 ft., Bottom: 5478 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4858 ft.NN
NIOBRARA7606 ft.NN
CODELL8067 ft.NN
J SAND8495 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 2/4/2021                  Interval Top: 8510 ft.    Interval Bottom: 8530 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/28/2008
Treatment Summary:JSND COMPLETION; FRAC'D THE J SAND W/ 155736 GAL 20 VISTAR HYBRID CORSS LINKED GEL CONTAINING 253800 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8510 ft.# Of Holes:40
Interval Bottom:8530 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/11/2021                 Interval Top: 8067 ft.    Interval Bottom: 8087 ft.

 Completed Information for Formation CODELL
1st Production Date:8/28/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:7/25/2012Treatment End Date:7/25/2012
Treatment Summary:4596 bbls of water, 16 bbls of additives (GW-45LF, GBW-21, HighPerm CRB, BC-3, BF-9L, ClayCare, XLW-14, XLW-22C, FRW-20, NE-945, Flo-Back 40, BioClear 1000) and 0 bbl HCL in a 1 stage frac with 125020 lbs of silica quartz proppant
Total fluid used in treatment (bbls):4612Max pressure during treatment (psi):4906
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):1.04
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):4612Disposition method For flowback:DISPOSAL
Total proppant used (lbs):125020Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8067 ft.# Of Holes:80
Interval Bottom:8087 ft.Hole Size:0.41 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 11/4/2008                 Interval Top: 7810 ft.    Interval Bottom: 8530 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/4/2008
Treatment Summary:DRILLED OUT CFP @ 7920 AND 8180 TO COMMINGLE THE JSND-NBRR-CDL 10/17/08; JSAND-NBRR-CDL COMMINGLE
Tubing Size:2.375 in.Tubing Setting Depth:8488 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/4/2008Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 165
BBLS_OIL 51
BTU_GAS 1000
CALC_BBLS_H2O 165
CALC_BBLS_OIL 51
CALC_GOR 5686
CALC_MCF_GAS 290
CASING_PRESS 1169
GRAVITY_OIL 47
MCF_GAS 290
TUBING_PRESS 308
Perforation Data:
Interval Top:7810 ft.# Of Holes:152
Interval Bottom:8530 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 2/4/2021                  Interval Top: 7810 ft.    Interval Bottom: 8087 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/30/2008
Treatment Summary:NBBR-CDL RECOMPLETION; SET CFP @ 8180. 9/29/08. FRAC'D THE CODELL W/ 110544 GAL 24 VISTAR HYBRID CROSS LINKED GEL CONTAINING 250080 SAND. SET CFP@ 7920. 10/1/08. FRAC'D THE NIOBRARA W/ 141078 GAL 18 VISTAR CROSS LINKED GEL HYBRID CONTAINING 250100 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/12/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 77
BBLS_OIL 48
BTU_GAS 1000
CALC_BBLS_H2O 77
CALC_BBLS_OIL 48
CALC_GOR 6438
CALC_MCF_GAS 309
CASING_PRESS 567
GRAVITY_OIL 47
MCF_GAS 309
Perforation Data:
Interval Top:7810 ft.# Of Holes:112
Interval Bottom:8087 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 8/11/2021                 Interval Top: 7810 ft.    Interval Bottom: 7826 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/28/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:8/1/2012Treatment End Date:8/1/2012
Treatment Summary:3293 bbls of water, 12 bbls of additives (GW-45LF, GBW-21, GBW-5, HighPerm CRB, BC-3, BF-9L, ClayCare, XLW-14, XLW-22C, FRW-20, NE-945, Flo-Back 40, BioClear 1000) and 0 bbl HCL in a stage frac with 250320 lbs of silica quartz proppant
Total fluid used in treatment (bbls):3305Max pressure during treatment (psi):5608
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):3305Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250320Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7810 ft.# Of Holes:32
Interval Bottom:7826 ft.Hole Size:0.71 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/04/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No