Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20643
Well Classification: GW Status: PA - 10/31/2024
Well Name/No:STIPANOVICH #41-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/31/2024
FacilityID:266670LocationID:321543
County:BROOMFIELD #014Location:NENE 27 1N68W 6
Field:WATTENBERG - #90750Elevation:5180 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:460FNL  860 FELLat/Long: 40.028138 / -104.983125Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.028188 / -104.983126Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 10/31/2024             Measured TD: 8554 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 10/31/2024
Wellbore Permit
Permit #:20030435 Expiration Date:3/11/2004
Proposed Depth/Form:8540 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: NE/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 320, Drill Unit: N/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 600, Top: 0 ft., Bottom: 850 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8540 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: 7200 ft., Bottom: 8540 ft.

Wellbore Completed
Completion Date:3/23/2004
Spud Date:3/6/2004Spud Date Is:ACTUAL
Measured TD:8554 ft.Measured PB depth:8525 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, MICRO LOG, ARRAY INDUCTION, COMPENSATED NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 901 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 447, Top: 0 ft., Bottom: 901 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8551 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 7076 ft., Bottom: 8554 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5655 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 4490 ft., Bottom: 5660 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4790 ft.NN
NIOBRARA7538 ft.NN
FORT HAYS7938 ft.NN
CODELL7960 ft.NN
CARLILE7980 ft.NN
GREENHORN8022 ft.NN
MOWRY8385 ft.NN
J SAND8402 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 10/31/2024                Interval Top: 8414 ft.    Interval Bottom: 8443 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/23/2004
Treatment Summary:FRAC'D THE J SAND W/ 140,400 GAL FRAC FLUID AND 204,800# 20/40 SAND, 3-29-04
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 68
BBLS_OIL 4
CALC_BBLS_H2O 68
CALC_BBLS_OIL 4
CALC_GOR 71250
CALC_MCF_GAS 285
CASING_PRESS 560
MCF_GAS 285
TUBING_PRESS 160
Perforation Data:
Interval Top:8414 ft.# Of Holes:50
Interval Bottom:8443 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 7/10/2024                 Interval Top: 7961 ft.    Interval Bottom: 7978 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/23/2004
Treatment Summary:CODELL RECOMPLETION SET CFP @ 8025'. 07-06-04 FRAC'D THE CODELL 7961'-7978' W/133,100 GAL FLUID AND 300,540# 20/40 SAND. 07-08-04
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 140
BBLS_OIL 60
CALC_BBLS_H2O 140
CALC_BBLS_OIL 60
CALC_GOR 4100
CALC_MCF_GAS 246
CASING_PRESS 750
MCF_GAS 246
Perforation Data:
Interval Top:7961 ft.# Of Holes:68
Interval Bottom:7978 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 8/27/2004                 Interval Top: 7961 ft.    Interval Bottom: 8443 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/23/2004
Treatment Summary:JSND-CD COMMINGLE SET CBP @5500' 08-24-04 DRILL OUT CBP @ 5500' AND 8025' ON 08-25-04 TO COMMINGLE THE JSND AND THE CODELL.
Tubing Size:2.375 in.Tubing Setting Depth:8406 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/27/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 140
CALC_BBLS_H2O 40
CALC_BBLS_OIL 140
CALC_GOR 3000
CALC_MCF_GAS 420
CASING_PRESS 1050
MCF_GAS 420
TUBING_PRESS 480
Perforation Data:
Interval Top:7961 ft.# Of Holes:118
Interval Bottom:8443 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 9/30/2005                 Interval Top: 7540 ft.    Interval Bottom: 8443 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:J-NIOBRARA-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/23/2004
Treatment Summary:JSND-NBRR-CODL COMMINGLE DRILLED UP CBP @ 7830' TO COMMINGLE THE JSND-NBRR-CDL. 9/28/05
Tubing Size:2.375 in.Tubing Setting Depth:8405 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 20
CALC_BBLS_H2O 40
CALC_BBLS_OIL 20
CALC_GOR 9850
CALC_MCF_GAS 197
CASING_PRESS 450
MCF_GAS 197
TUBING_PRESS 300
Perforation Data:
Interval Top:7540 ft.# Of Holes:318
Interval Bottom:8443 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/31/2024                Interval Top: 7540 ft.    Interval Bottom: 7978 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/23/2004
Treatment Summary:NB-CD RECOMPLETION (NBRR RECOMPLETION; CODL RECOMPLETED 7/8/04) FRAC'D THE CODL (7961'-7978') WITH 133,100 GAL FLUID AND 300,540# 20/40 SAND. 7/8/04 SET CBP@7830'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7540 ft.# Of Holes:268
Interval Bottom:7978 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/15/2024                 Interval Top: 7540 ft.    Interval Bottom: 7730 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7540 ft.# Of Holes:200
Interval Bottom:7730 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/31/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No