|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/6/2021 Measured TD: 8575 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/6/2021 | Wellbore Permit | | Permit #: | 19980062 | Expiration Date: | 1/26/1999 | Proposed Depth/Form: | 8660 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: NE/4 | Formation And Spacing: | Code: JNBCD , Formation: J-NIOBRARA-CODELL , Order: 232&407 , Unit Acreage: 320, Drill Unit: E2 |
| | |
Wellbore Completed | Completion Date: | 4/19/1995 | Spud Date: | 1/24/1995 | Spud Date Is: | ACTUAL | Measured TD: | 8575 ft. | Measured PB depth: | 8550 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Log Types: | DIL, FDC, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1053 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 260, Top: 0 ft., Bottom: 1053 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 8573 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 600, Top: 3322 ft., Bottom: 8573 ft., Determination Method: CBL | Casing: | String Type: OPEN HOLE, Hole Size: 3.875 in., Size: , Top: , Depth: 8660 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4756 ft. | | | | NIOBRARA | 7556 ft. | | | | CODELL | 8008 ft. | | | | D SAND | 8418 ft. | | | | J SAND | 8433 ft. | | | | DAKOTA | 8600 ft. | | | |
Formation DKTA Formation Classification: GW Status: AB - 1/6/2021 Interval Top: 8600 ft. Completed Information for Formation DAKOTA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DAKOTA | Commingled: | Yes | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DKTA. |
| No Perforation Data was found for formation DKTA. |
|
Formation JSND Formation Classification: GW Status: AB - 1/6/2021 Interval Top: 8447 ft. Interval Bottom: 8463 ft. Completed Information for Formation J SAND | 1st Production Date: | 2/17/1995 | Choke Size: | 0.469 in. | Formation Name: | J SAND | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/19/1995 | Treatment Summary: | FRAC W/ 530,000# 20/40 M IN 144,396 GAL FLUID |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8436 ft. | Tubing Packer Depth: | 8049 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/28/1995 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 25 | BBLS_OIL | 2 | CALC_GOR | 110000 | CASING_PRESS | 360 | MCF_GAS | 220 | TUBING_PRESS | 120 |
| Perforation Data: | Interval Top: | 8447 ft. | # Of Holes: | 64 | Interval Bottom: | 8463 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 6/29/2003 Interval Top: 7584 ft. Interval Bottom: 7920 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/19/1995 | Treatment Summary: | SET CIBP @ 7990'. PERF'D THE NIOBRARA FROM 7584'-7614', 7890'-7920' W/2 SPF. FRAC'D W/225,450 GAL SLICK WATER GEL CONTAINING 100,640# 20/40 SAND. FLOW BACK FRAC. RIH W/TBG. LAND TBG. SWAB. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7525 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/29/2003 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 63 | BBLS_OIL | 1 | CALC_BBLS_H2O | 63 | CALC_BBLS_OIL | 1 | CALC_GOR | 631000 | CALC_MCF_GAS | 631 | CASING_PRESS | 620 | MCF_GAS | 631 | TUBING_PRESS | 390 |
| Perforation Data: | Interval Top: | 7584 ft. | # Of Holes: | 120 | Interval Bottom: | 7920 ft. | Hole Size: | |
|
Formation DKJNC Formation Classification: GW Status: CM - 12/8/1999 Interval Top: 7566 ft. Interval Bottom: 8463 ft. Completed Information for Formation DAKOTA-J-NIOBRARA-CODELL | 1st Production Date: | 2/19/1998 | Choke Size: | | Formation Name: | DAKOTA-J-NIOBRARA-CODELL | Commingled: | Yes | Production Method: | PUMPING | Open Hole Completion: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8439 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/20/1998 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 5 | BBLS_OIL | 2 | BTU_GAS | 1168 | CALC_GOR | 46500 | CASING_PRESS | 180 | MCF_GAS | 93 | TUBING_PRESS | 160 |
| Perforation Data: | Interval Top: | 7566 ft. | # Of Holes: | 79 | Interval Bottom: | 8463 ft. | Hole Size: | 0.33 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 12/27/2003 Interval Top: 7566 ft. Interval Bottom: 8463 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | Production Method: | PUMPING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/19/1995 | Treatment Summary: | DRILL OUT CIBP @ 7990'. PUSH TO 8488'. POH. RIH W/ NC/SN, JTS, TBG. LAND EOT @ 8423'. BROACH TBG TO SN. SWAB |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8423 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/27/2003 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 29 | BBLS_OIL | 2 | CALC_BBLS_H2O | 29 | CALC_BBLS_OIL | 2 | CALC_GOR | 177070 | CALC_MCF_GAS | 278 | CASING_PRESS | 430 | MCF_GAS | 278 | TUBING_PRESS | 130 |
| Perforation Data: | Interval Top: | 7566 ft. | # Of Holes: | 187 | Interval Bottom: | 8463 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/6/2021 Interval Top: 7566 ft. Interval Bottom: 8023 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/10/1995 | Choke Size: | 0.500 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/19/1995 | Treatment Summary: | ACIDIZE W/ 1,000 GAL 15% HCL + 30 BALL SEALERS, FRAC W/ 450,000# 20/40 M IN 125,454 GAL FLUID |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8436 ft. | Tubing Packer Depth: | 8049 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/14/1995 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 23 | BBLS_OIL | 55 | CALC_GOR | 4364 | CASING_PRESS | 140 | MCF_GAS | 240 |
| Perforation Data: | Interval Top: | 7566 ft. | # Of Holes: | 15 | Interval Bottom: | 8023 ft. | Hole Size: | 0.33 in. |
|
|
|
|
|
Reported Plugged | Y | 01/06/2021 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|