Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06667
Well Classification: OW Status: PA - 7/3/2019
Well Name/No:CANYON CREEK #4-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/3/2019
FacilityID:429576LocationID:415299
Municipality/County:ERIE / BOULDER #013Location:NWSE 13 1N69W 6
Field:WATTENBERG - #90750Elevation:5058 ft.
Planned Location:2026FSL  2098 FELLat/Long: 40.049520 / -105.062980Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.049530 / -105.062985Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/2/2012
End Date: 8/2/2012
Reported: 9/13/2012
Days to report: 42
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/3/2019             Measured TD: 8513 ft.    Vertical TD: 8382 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/3/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/11/2014
Proposed Top PZ Location:Sec:13 Twp: 1N 69W Footage: 1303 FSL  1320 FEL
Bottom Hole Location:Sec:13 Twp: 1N 69W Footage: 1247 FSL  1297 FEL
Proposed Depth/Form:8512 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: SE/4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 790 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 0 ft., Bottom: 790 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8512 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 7326 ft., Bottom: 8512 ft.

Wellbore Completed
Completion Date:7/18/2012
Spud Date:7/14/2012Spud Date Is:ACTUAL
Measured TD:8513 ft.Measured PB depth:8458 ft.
True Vertical TD:8382 ft.True Vertical PB depth:8327 ft.
Top PZ Location:Sec:13 Twp: 1N 69WFootage: 1303 FSL  1320 FEL
Bottom Hole Location:Sec:13 Twp: 1N 69WFootage: 1247 S  1297 E
Log Types:CBL, Dual Ind/Compensated Density/Compensated Neutron
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 838 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 838 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8503 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 3050 ft., Bottom: 8513 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4638 ft.
NIOBRARA7561 ft.
J SAND8379 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 7/3/2019                  Interval Top: 8391 ft.    Interval Bottom: 8407 ft.

 Completed Information for Formation J SAND
1st Production Date:10/19/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/22/2012Treatment End Date:8/23/2012
Treatment Summary:Frac'd the J-Sand 8,391’ – 8,407’, (48 holes)w/ 54,171 gal 18 # pHaser Hybrid cross linked gel containing 195,816 # 20/40 Sand. 08-02-12
Total fluid used in treatment (bbls):3565Max pressure during treatment (psi):3944
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):-0.70
Recycled water used in treatment (bbls):3565Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):195816Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8391 ft.# Of Holes:48
Interval Bottom:8407 ft.Hole Size:0.42 in.

Formation JNBRR                   Formation Classification:  OW                   Status:  CM - 12/21/2012                Interval Top: 7566 ft.    Interval Bottom: 8407 ft.

 Completed Information for Formation J-NIOBRARA
1st Production Date:10/19/2012Choke Size: 
Formation Name:J-NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:12/21/2012Treatment End Date:N/A
Treatment Summary:Set CBP @ 7445'. 08-22-12 Drilled out CBP and CFP's to commingle the JSND-NBRR. 08-23-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8356 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/21/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 80
BBLS_OIL 103
BTU_GAS 1207
CALC_BBLS_H2O 80
CALC_BBLS_OIL 103
CALC_GOR 3612
CALC_MCF_GAS 372
CASING_PRESS 1721
GRAVITY_OIL 52
MCF_GAS 372
TUBING_PRESS 957
Perforation Data:
Interval Top:7566 ft.# Of Holes:88
Interval Bottom:8407 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/7/2013                  Interval Top: 7566 ft.    Interval Bottom: 7739 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/19/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/22/2012Treatment End Date:8/2/2012
Treatment Summary:Set CFP @ 8190'. 08-02-12 Frac'd the Niobrara 7,566’ – 7,570’; 7,733’-7,739’ (40 holes), w/ 83,510 gals 18 # pHaser Hybrid cross linked gel containing 180,543 # 20/40 sand. 08-02-12
Total fluid used in treatment (bbls):2943Max pressure during treatment (psi):6548
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.72
Recycled water used in treatment (bbls):2943Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):180919Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7566 ft.# Of Holes:40
Interval Bottom:7739 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/03/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No