Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06667
Well Classification: OW Status: PA - 7/3/2019
Well Name/No:CANYON CREEK #4-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/3/2019
FacilityID:429576LocationID:415299
Municipality/County:ERIE / BOULDER #013Location:NWSE 13 1N69W 6
Field:WATTENBERG - #90750Elevation:5058 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2026FSL  2098 FELLat/Long: 40.049520 / -105.062980Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.049530 / -105.062985Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/2/2012
End Date: 8/2/2012
Reported: 9/13/2012
Days to report: 42
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/3/2019             Measured TD: 8513 ft.    Vertical TD: 8382 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/3/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/11/2014
Proposed Top PZ Location:Sec:13 Twp: 1N 69W Footage: 1303 FSL  1320 FEL
Bottom Hole Location:Sec:13 Twp: 1N 69W Footage: 1247 FSL  1297 FEL
Proposed Depth/Form:8512 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: SE/4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 790 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 0 ft., Bottom: 790 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8512 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 7326 ft., Bottom: 8512 ft.

Wellbore Completed
Completion Date:7/18/2012
Spud Date:7/14/2012Spud Date Is:ACTUAL
Measured TD:8513 ft.Measured PB depth:8458 ft.
True Vertical TD:8382 ft.True Vertical PB depth:8327 ft.
Top PZ Location:Sec:13 Twp: 1N 69WFootage: 1303 FSL  1320 FEL
Bottom Hole Location:Sec:13 Twp: 1N 69WFootage: 1247 FSL  1297 FEL
Log Types:CBL, Dual Ind/Compensated Density/Compensated Neutron
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 838 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 838 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8503 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 3050 ft., Bottom: 8513 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4638 ft.
NIOBRARA7561 ft.
J SAND8379 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 7/3/2019                  Interval Top: 8391 ft.    Interval Bottom: 8407 ft.

 Completed Information for Formation J SAND
1st Production Date:10/19/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/22/2012Treatment End Date:8/23/2012
Treatment Summary:Frac'd the J-Sand 8,391’ – 8,407’, (48 holes)w/ 54,171 gal 18 # pHaser Hybrid cross linked gel containing 195,816 # 20/40 Sand. 08-02-12
Total fluid used in treatment (bbls):3565Max pressure during treatment (psi):3944
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):-0.70
Recycled water used in treatment (bbls):3565Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):195816Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8391 ft.# Of Holes:48
Interval Bottom:8407 ft.Hole Size:0.42 in.

Formation JNBRR                   Formation Classification:  OW                   Status:  CM - 12/21/2012                Interval Top: 7566 ft.    Interval Bottom: 8407 ft.

 Completed Information for Formation J-NIOBRARA
1st Production Date:10/19/2012Choke Size: 
Formation Name:J-NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:12/21/2012Treatment End Date:N/A
Treatment Summary:Set CBP @ 7445'. 08-22-12 Drilled out CBP and CFP's to commingle the JSND-NBRR. 08-23-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:No
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8356 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/21/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 80
BBLS_OIL 103
BTU_GAS 1207
CALC_BBLS_H2O 80
CALC_BBLS_OIL 103
CALC_GOR 3612
CALC_MCF_GAS 372
CASING_PRESS 1721
GRAVITY_OIL 52
MCF_GAS 372
TUBING_PRESS 957
Perforation Data:
Interval Top:7566 ft.# Of Holes:88
Interval Bottom:8407 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/7/2013                  Interval Top: 7566 ft.    Interval Bottom: 7739 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/19/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/22/2012Treatment End Date:8/2/2012
Treatment Summary:Set CFP @ 8190'. 08-02-12 Frac'd the Niobrara 7,566’ – 7,570’; 7,733’-7,739’ (40 holes), w/ 83,510 gals 18 # pHaser Hybrid cross linked gel containing 180,543 # 20/40 sand. 08-02-12
Total fluid used in treatment (bbls):2943Max pressure during treatment (psi):6548
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.72
Recycled water used in treatment (bbls):2943Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):180919Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7566 ft.# Of Holes:40
Interval Bottom:7739 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/03/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No