Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2023 Measured TD: 8520 ft. Vertical TD: 8168 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 9/7/2013 | Proposed Top PZ Location: | Sec:36 Twp: 2N 69W | Footage: 2666 FNL 2569 FWL | Bottom Hole Location: | Sec:36 Twp: 2N 69W | Footage: 2574 FNL 2627 FWL | Proposed Depth/Form: | 8477 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 273, Top: 0 ft., Bottom: 750 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8477 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 177, Top: 7374 ft., Bottom: 8477 ft. | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5345 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 154, Top: 4221 ft., Bottom: 5345 ft. |
| | |
Wellbore Completed | Completion Date: | 8/28/2012 | Spud Date: | 8/24/2012 | Spud Date Is: | ACTUAL | Measured TD: | 8520 ft. | Measured PB depth: | 8448 ft. | True Vertical TD: | 8168 ft. | True Vertical PB depth: | 8096 ft. | Top PZ Location: | Sec:36 Twp: 2N 69W | Footage: 2666 FNL 2569 FWL | Bottom Hole Location: | Sec:36 Twp: 2N 69W | Footage: 2574 FNL 2627 FWL | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12 in., Size: 8.625 in., Top: 0 ft., Depth: 795 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 0 ft., Bottom: 805 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7 in., Size: 4.5 in., Top: 0 ft., Depth: 8505 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 720, Top: 3640 ft., Bottom: 8520 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4537 ft. | | | | NIOBRARA | 7678 ft. | | | | CODELL | 8015 ft. | | | | J SAND | 8390 ft. | | | |
Formation JSND Formation Classification: OW Status: PR - 5/1/2023 Interval Top: 8391 ft. Interval Bottom: 8429 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/13/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 9/13/2012 | Treatment End Date: | 9/24/2012 | Treatment Summary: | Frac'd the J-Sand 8391'-8396', 8400'-8429', (50 holes)w/ 62,874 gal 18 # Vistar Hybrid
cross linked gel containing 250,120 # 20/40 Sand. 09-15-12
Formation is commingled with another formation - YES | Total fluid used in treatment (bbls): | 3778 | Max pressure during treatment (psi): | 3712 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.58 | Recycled water used in treatment (bbls): | 3778 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | 250120 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8391 ft. | # Of Holes: | 50 | Interval Bottom: | 8429 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 2/15/2013 Interval Top: 8015 ft. Interval Bottom: 8029 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/13/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 9/13/2012 | Treatment End Date: | 9/24/2012 | Treatment Summary: | Set CFP @ 8080'. 09-15-12
Frac'd the Codell 8015-8029’ (42 holes) w/ 90,720 gal 22# Vistar Hybrid cross linked gel
containing 251,500 # 30/50 sand. 09-16-12 | Total fluid used in treatment (bbls): | 2782 | Max pressure during treatment (psi): | 4802 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.76 | Recycled water used in treatment (bbls): | 2782 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 251500 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8015 ft. | # Of Holes: | 42 | Interval Bottom: | 8029 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/16/2012 Interval Top: 7766 ft. Interval Bottom: 8420 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/13/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 10/16/2012 | Treatment End Date: | N/A | Treatment Summary: | Set CBP @ 7730'. 09-23-12
Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 09-24-12 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8378 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/16/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 96 | BBLS_OIL | 165 | BTU_GAS | 1269 | CALC_BBLS_H2O | 96 | CALC_BBLS_OIL | 165 | CALC_GOR | 3879 | CALC_MCF_GAS | 640 | CASING_PRESS | 1897 | GRAVITY_OIL | 52 | MCF_GAS | 640 | TUBING_PRESS | 1100 |
| Perforation Data: | Interval Top: | 7766 ft. | # Of Holes: | 140 | Interval Bottom: | 8420 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: PR - 5/1/2023 Interval Top: 7766 ft. Interval Bottom: 8029 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/13/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7766 ft. | # Of Holes: | 90 | Interval Bottom: | 8029 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 2/15/2013 Interval Top: 7766 ft. Interval Bottom: 7778 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 10/13/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 9/13/2012 | Treatment End Date: | 9/24/2012 | Treatment Summary: | Set CFP @ 7820'. 09-16-12
Frac'd the Niobrara 7766'-7778’, (48 holes), w/ 97,944 gals 18 # Vistar Hybrid cross linked
gel containing 251,040 # 30/50 sand. 09-16-12 | Total fluid used in treatment (bbls): | 3242 | Max pressure during treatment (psi): | 4112 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.75 | Recycled water used in treatment (bbls): | 3242 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 251040 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7766 ft. | # Of Holes: | 48 | Interval Bottom: | 7778 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 396 |
Total Gas Produced (MCF) | 10983 |
GOR | 27734 |
GOR Determination | MCFE |
Average BOE per Day | 6.281 |
Average MCFE per Day | 36.409 |
Federal Financial Assurance | i | |
|
|