|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 2/1/2025 Measured TD: 8636 ft. Vertical TD: 8330 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 2/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/10/2012 | | Proposed Top PZ Location: | Sec:13 Twp: 1N 69W | Footage: 2017 FNL 1996 FWL | | Bottom Hole Location: | Sec:13 Twp: 1N 69W | Footage: 2010 FNL 2006 FWL | | Proposed Depth/Form: | 8553 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8553 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 310, Top: 7387 ft., Bottom: 8553 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/4/2011 | | Spud Date: | 3/29/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8636 ft. | Measured PB depth: | 8588 ft. | | True Vertical TD: | 8330 ft. | True Vertical PB depth: | 8282 ft. | | Top PZ Location: | Sec:13 Twp: 1N 69W | Footage: 2017 FNL 1996 FWL | | Bottom Hole Location: | Sec:13 Twp: 1N 69W | Footage: 2010 FNL 2006 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 958 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: 958 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8624 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 720, Top: 3370 ft., Bottom: 8624 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4734 ft. | | | | | NIOBRARA | 7670 ft. | | | | | CODELL | 8084 ft. | | | | | J SAND | 8510 ft. | | | |
Formation JSND Formation Classification: Status: PR - 2/1/2025 Interval Top: 8522 ft. Interval Bottom: 8538 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/3/2011 | | Treatment Summary: | J SAND COMPLETION. FRAC JSAND 8522'-8538', (32 HOLES) W/65,352 GAL 18 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,180 # 20/40 SAND. 05/03/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8522 ft. | # Of Holes: | 32 | | Interval Bottom: | 8538 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: Status: CM - 6/12/2011 Interval Top: 7670 ft. Interval Bottom: 8538 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/12/2011 | | Treatment Summary: | J SAND COMPLETION. SET CIBP @ 7560. 6/7/2011. DRILLED OUT CBP @7650. CFP @7920 AND 8150 TO COMMINGLE THE JSND-CDL-NBRR. 6/8/11. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8497 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/12/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 70 | | BBLS_OIL | 55 | | BTU_GAS | 1177 | | CALC_BBLS_H2O | 70 | | CALC_BBLS_OIL | 55 | | CALC_GOR | 8418 | | CALC_MCF_GAS | 463 | | CASING_PRESS | 738 | | GRAVITY_OIL | 51 | | MCF_GAS | 463 | | TUBING_PRESS | 1068 |
| | Perforation Data: | | Interval Top: | 7670 ft. | # Of Holes: | 188 | | Interval Bottom: | 8538 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: Status: PR - 2/1/2025 Interval Top: 7670 ft. Interval Bottom: 8102 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/4/2011 | | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 8150'. 05/04/11. FRAC'D THE CODELL 8084'-8102', (36 HOLES) W/90,384 GAL 22 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,100 # 20/40 SAND. 05/04/11. SET CFP @ 7920'. 05/04/11. FRAC'D THE NIOBRARA 7670'-7684' AND 7826'-7842' (120 HOLES) W/98,406 GALS 18 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,220 # 20/40 SAND 05/04/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7670 ft. | # Of Holes: | 156 | | Interval Bottom: | 8102 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 518 |
| Total Gas Produced (MCF) | 5941 |
| GOR | 11469 |
| GOR Determination | BOE |
| Average BOE per Day | 4.508 |
| Average MCFE per Day | 26.148 |
| Federal Financial Assurance | i | |
|
|