|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/1/2024 Measured TD: 8680 ft. Vertical TD: 8306 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/1/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/10/2012 | | Proposed Top PZ Location: | Sec:13 Twp: 1N 69W | Footage: 2505 FNL 1324 FWL | | Bottom Hole Location: | Sec:13 Twp: 1N 69W | Footage: 2497 FNL 1323 FWL | | Proposed Depth/Form: | 8636 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8636 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 7471 ft., Bottom: 8636 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/26/2011 | | Spud Date: | 4/20/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8680 ft. | Measured PB depth: | 8636 ft. | | True Vertical TD: | 8306 ft. | True Vertical PB depth: | 8262 ft. | | Top PZ Location: | Sec:13 Twp: 1N 69W | Footage: 2505 FNL 1324 FWL | | Bottom Hole Location: | Sec:13 Twp: 1N 69W | Footage: 2497 FNL 1323 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 963 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 345, Top: 0 ft., Bottom: 963 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8666 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 726, Top: 3200 ft., Bottom: 8666 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4782 ft. | | | | | NIOBRARA | 7738 ft. | | | | | CODELL | 8140 ft. | | | | | J SAND | 8570 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 10/1/2024 Interval Top: 8584 ft. Interval Bottom: 8600 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/9/2011 | | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J-SAND 8584'-8600', (32 HOLES) W/156,366 GAL 19 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,640 # 20/40 SAND. 05/09/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8584 ft. | # Of Holes: | 32 | | Interval Bottom: | 8600 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/21/2011 Interval Top: 7738 ft. Interval Bottom: 8600 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/21/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE: SET CBP @ 7680'. 06/15/11. DRILLED OUT CBP @ 7680', CFP @ 8250' AND 7380' TO COMMINGLE THE JSND-CDL-NBRR. 06/16/11. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8546 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/21/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 75 | | BBLS_OIL | 44 | | BTU_GAS | 1177 | | CALC_BBLS_H2O | 75 | | CALC_BBLS_OIL | 44 | | CALC_GOR | 5705 | | CALC_MCF_GAS | 251 | | CASING_PRESS | 1997 | | GRAVITY_OIL | 50 | | MCF_GAS | 251 | | TUBING_PRESS | 1063 |
| | Perforation Data: | | Interval Top: | 7738 ft. | # Of Holes: | 32 | | Interval Bottom: | 8600 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: PR - 10/1/2024 Interval Top: 7738 ft. Interval Bottom: 8158 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/10/2011 | | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 8250'. 05/10/11. FRAC'D THE CODELL 8140'-8158' (36 HOLES) W/115,752 GAL 22 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,960 # 20/40 SAND. 05/10/11. SET CFP @ 7380'. 05/10/11. FRAC'D THE NIOBRARA 7738'-7752', 7904'-7924' (136 HOLES) W/130,411 GALS 18# PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 249,460 # 30/50 SAND. 05/10/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7738 ft. | # Of Holes: | 172 | | Interval Bottom: | 8158 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 525 |
| Total Gas Produced (MCF) | 7053 |
| GOR | 13434 |
| GOR Determination | BOE |
| Average BOE per Day | 4.646 |
| Average MCFE per Day | 26.967 |
| Federal Financial Assurance | i | |
|
|