|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/2/2019 Measured TD: 8802 ft. Vertical TD: 8395 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/2/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 12/10/2013 | Proposed Top PZ Location: | Sec:13 Twp: 1N 69W | Footage: 20 FSL 2601 FEL | Bottom Hole Location: | Sec:13 Twp: 1N 69W | Footage: 37 FSL 2528 FEL | Proposed Depth/Form: | 8501 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-32 , Unit Acreage: 160, Drill Unit: SE4 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 790 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 280, Top: 0 ft., Bottom: 790 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8501 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 300, Top: 7326 ft., Bottom: 8501 ft. |
| | |
Wellbore Completed | Completion Date: | 7/13/2012 | Spud Date: | 7/9/2012 | Spud Date Is: | ACTUAL | Measured TD: | 8802 ft. | Measured PB depth: | 8760 ft. | True Vertical TD: | 8395 ft. | True Vertical PB depth: | 8353 ft. | Top PZ Location: | Sec:13 Twp: 1N 69W | Footage: 20 FSL 2601 FEL | Bottom Hole Location: | Sec:13 Twp: 1N 69W | Footage: 37 S 2528 E | Log Types: | CBL | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 197 ft., Weight: 84 , Citings Type: ACTUAL | Cement: | Sacks: 155, Top: 0 ft., Bottom: 197 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 839 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 410, Top: 0 ft., Bottom: 850 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8788 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 700, Top: 3720 ft., Bottom: 8802 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4873 ft. | | | | NIOBRARA | 7869 ft. | | | | CODELL | 8267 ft. | | | | J SAND | 8673 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 7/2/2019 Interval Top: 8686 ft. Interval Bottom: 8702 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/12/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/21/2012 | Treatment End Date: | 8/21/2012 | Treatment Summary: | Frac'd the J-Sand 8,686’ – 8,702’, (48 holes)w/ 65,564 gal 18 # pHaser Hybrid
cross linked gel containing 252,350 # 20/40 Sand. 08-05-12 | Total fluid used in treatment (bbls): | 3845 | Max pressure during treatment (psi): | 3384 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.43 | Recycled water used in treatment (bbls): | 3845 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 252699 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8686 ft. | # Of Holes: | 48 | Interval Bottom: | 8702 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 2/7/2013 Interval Top: 8268 ft. Interval Bottom: 8282 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/12/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/21/2012 | Treatment End Date: | 8/21/2012 | Treatment Summary: | Set CFP @ 8475'. 08-05-12
Frac'd the Codell 8,268’ – 8,282’ (42 holes) w/ 89,512 gal 22# pHaser Hybrid cross linked gel
containing 251,881 # 30/50 sand 08-05-12 | Total fluid used in treatment (bbls): | 2756 | Max pressure during treatment (psi): | 4399 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.43 | Recycled water used in treatment (bbls): | 2756 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 251881 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8268 ft. | # Of Holes: | 42 | Interval Bottom: | 8282 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/13/2012 Interval Top: 7874 ft. Interval Bottom: 8702 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/12/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 10/13/2012 | Treatment End Date: | N/A | Treatment Summary: | Set CBP @ 7830'. 08-19-12
Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 08-21-12 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8671 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/13/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 135 | BBLS_OIL | 85 | BTU_GAS | 1207 | CALC_BBLS_H2O | 135 | CALC_BBLS_OIL | 85 | CALC_GOR | 5729 | CALC_MCF_GAS | 487 | CASING_PRESS | 1577 | GRAVITY_OIL | 52 | MCF_GAS | 487 | TUBING_PRESS | 736 |
| Perforation Data: | Interval Top: | 7874 ft. | # Of Holes: | 130 | Interval Bottom: | 8702 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/2/2019 Interval Top: 7874 ft. Interval Bottom: 8282 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/12/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7874 ft. | # Of Holes: | 82 | Interval Bottom: | 8282 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 2/7/2013 Interval Top: 7874 ft. Interval Bottom: 8046 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 10/12/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/21/2012 | Treatment End Date: | 8/21/2012 | Treatment Summary: | Set CFP @ 8120'. 08-05-12
Frac'd the Niobrara 7,874-7878’; 8,040-8,046’. (40 holes), w/ 99,479 gals 18 # pHaser
Hybrid cross linked gel containing 254,939 # 30/50 sand. 08-05-12 | Total fluid used in treatment (bbls): | 3291 | Max pressure during treatment (psi): | 4317 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.43 | Recycled water used in treatment (bbls): | 3291 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 250520 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7874 ft. | # Of Holes: | 40 | Interval Bottom: | 8046 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 07/02/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|