Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06633
Well Classification: OW Status: PA - 6/6/2019
Well Name/No:CANYON CREEK #8-6-13 X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/6/2019
FacilityID:416934LocationID:415299
Municipality/County:ERIE / BOULDER #013Location:NWSE 13 1N69W 6
Field:WATTENBERG - #90750Elevation:5058 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2036FSL  2115 FELLat/Long: 40.049550 / -105.063040Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.049551 / -105.063038Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/5/2012
End Date: 8/5/2012
Reported: 9/13/2012
Days to report: 39
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/6/2019             Measured TD: 8829 ft.    Vertical TD: 8430 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/6/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/10/2013
Proposed Top PZ Location:Sec:13 Twp: 1N 69W Footage: 1295 FSL  134 FEL
Bottom Hole Location:Sec:13 Twp: 1N 69W Footage: 1299 FSL  118 FEL
Proposed Depth/Form:8763 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-32 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 790 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 0 ft., Bottom: 790 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8763 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 7608 ft., Bottom: 8763 ft.

Wellbore Completed
Completion Date:7/8/2012
Spud Date:7/4/2012Spud Date Is:ACTUAL
Measured TD:8829 ft.Measured PB depth:8776 ft.
True Vertical TD:8430 ft.True Vertical PB depth:8377 ft.
Top PZ Location:Sec:13 Twp: 1N 69WFootage: 1295 FSL  134 FEL
Bottom Hole Location:Sec:13 Twp: 1N 69WFootage: 1299 FSL  118 FEL
Log Types:CBL
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 189 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 155, Top: 0 ft., Bottom: 189 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 839 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 850 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8805 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 695, Top: 4150 ft., Bottom: 8829 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4850 ft.
NIOBRARA7805 ft.
CODELL8211 ft.
J SAND8652 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 6/6/2019                  Interval Top: 8665 ft.    Interval Bottom: 8681 ft.

 Completed Information for Formation J SAND
1st Production Date:10/12/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/21/2012Treatment End Date:8/18/2012
Treatment Summary:Frac'd the J-Sand 8,665’ – 8,681’, (48 holes)w/ 65,167 gal 18 # pHaser Hybrid cross linked gel containing 251,603 # 20/40 Sand. 08-04-12
Total fluid used in treatment (bbls):2762Max pressure during treatment (psi):4739
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):2762Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):249419Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8665 ft.# Of Holes:42
Interval Bottom:8681 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/7/2013                  Interval Top: 8212 ft.    Interval Bottom: 8226 ft.

 Completed Information for Formation CODELL
1st Production Date:10/12/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/21/2012Treatment End Date:8/18/2012
Treatment Summary:Set CFP @ 8513'. 08-04-12 Frac'd the Codell 8,212’ – 8,226’ (42 holes) w/ 88,290 gal 22# pHaser Hybrid cross linked gel containing 249,419 # 30/50 sand. 08-04-12
Total fluid used in treatment (bbls):2762Max pressure during treatment (psi):4739
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):2762Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):249419Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8212 ft.# Of Holes:42
Interval Bottom:8226 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 10/13/2012                Interval Top: 7971 ft.    Interval Bottom: 8681 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:10/12/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/13/2012Treatment End Date:N/A
Treatment Summary:Set CBP @ 7765'. 08-17-12 Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 08-18-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8635 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/13/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 135
BBLS_OIL 134
BTU_GAS 1207
CALC_BBLS_H2O 135
CALC_BBLS_OIL 134
CALC_GOR 5933
CALC_MCF_GAS 795
CASING_PRESS 2280
GRAVITY_OIL 52
MCF_GAS 795
TUBING_PRESS 1420
Perforation Data:
Interval Top:7971 ft.# Of Holes:130
Interval Bottom:8681 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 6/6/2019                  Interval Top: 7971 ft.    Interval Bottom: 8226 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/12/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7971 ft.# Of Holes:90
Interval Bottom:8226 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 2/7/2013                  Interval Top: 7809 ft.    Interval Bottom: 7977 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/12/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/21/2012Treatment End Date:8/18/2012
Treatment Summary:Set CFP @ 8040'. 08-05-12 Frac'd the Niobrara 7,809-7,813’; 7,971-7,977’. (40 holes), w/ 98,041 gals 18 # pHaser Hybrid cross linked gel containing 249,600 # 30/50 sand. 08-05-12
Total fluid used in treatment (bbls):3282Max pressure during treatment (psi):4198
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.76
Recycled water used in treatment (bbls):3282Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250700Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7809 ft.# Of Holes:40
Interval Bottom:7977 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/06/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No