|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 11/17/2022 Measured TD: 8650 ft. Vertical TD: 8400 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 11/17/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 12/10/2013 | Proposed Top PZ Location: | Sec:13 Twp: 1N 69W | Footage: 2070 FSL 544 FEL | Bottom Hole Location: | Sec:13 Twp: 1N 69W | Footage: 2067 FSL 530 FEL | Proposed Depth/Form: | 8607 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-32 , Unit Acreage: 160, Drill Unit: SE4 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 790 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 280, Top: 0 ft., Bottom: 790 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8607 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 300, Top: 7442 ft., Bottom: 8607 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5496 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 250, Top: 4460 ft., Bottom: 5496 ft. |
| | |
Wellbore Completed | Completion Date: | 7/2/2012 | Spud Date: | 6/27/2012 | Spud Date Is: | ACTUAL | Measured TD: | 8650 ft. | Measured PB depth: | 8565 ft. | True Vertical TD: | 8400 ft. | True Vertical PB depth: | 8336 ft. | Top PZ Location: | Sec:13 Twp: 1N 69W | Footage: 2070 FSL 544 FEL | Bottom Hole Location: | Sec:13 Twp: 1N 69W | Footage: 2067 S 530 E | Log Types: | CBL, Dual Ind/Compensated Density/Compensated Neutron | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 182 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 0, Top: 0 ft., Bottom: 182 ft., Determination Method: CALC | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 838 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 850 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8637 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 700, Top: 1800 ft., Bottom: 8650 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4723 ft. | | | | NIOBRARA | 7644 ft. | | | | CODELL | 8048 ft. | | | | J SAND | 8484 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 11/17/2022 Interval Top: 8495 ft. Interval Bottom: 8511 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/19/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/21/2012 | Treatment End Date: | 8/16/2012 | Treatment Summary: | Frac'd the J-Sand 8,495’ – 8,511’, (48 holes)w/ 63,121 gal 18 # pHaser Hybrid
cross linked gel containing 242,600 # 20/40 Sand. 08-04-12 | Total fluid used in treatment (bbls): | 2764 | Max pressure during treatment (psi): | 4776 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.43 | Recycled water used in treatment (bbls): | 2764 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 249899 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8495 ft. | # Of Holes: | 48 | Interval Bottom: | 8511 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 2/7/2013 Interval Top: 8049 ft. Interval Bottom: 8063 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/19/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/21/2012 | Treatment End Date: | 8/16/2012 | Treatment Summary: | Set CFP @ 8325'. 08-04-12
Frac'd the Codell 8,049’ – 8,063’ (42 holes) w/ 88343 gal 22# pHaser Hybrid cross linked gel
containing 252,144 # 20/40 sand. 08-04-12 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8049 ft. | # Of Holes: | 42 | Interval Bottom: | 8063 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/9/2012 Interval Top: 7648 ft. Interval Bottom: 8511 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/19/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 10/9/2012 | Treatment End Date: | N/A | Treatment Summary: | Set CBP @ 7570'. 08-15-12
Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 08-16-12 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8462 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/9/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 60 | BBLS_OIL | 52 | BTU_GAS | 1207 | CALC_BBLS_H2O | 60 | CALC_BBLS_OIL | 52 | CALC_GOR | 4615 | CALC_MCF_GAS | 240 | CASING_PRESS | 2116 | GRAVITY_OIL | 52 | MCF_GAS | 240 | TUBING_PRESS | 1292 |
| Perforation Data: | Interval Top: | 7648 ft. | # Of Holes: | 180 | Interval Bottom: | 8511 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/17/2022 Interval Top: 7648 ft. Interval Bottom: 8063 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/19/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7648 ft. | # Of Holes: | 130 | Interval Bottom: | 8063 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 2/7/2013 Interval Top: 7648 ft. Interval Bottom: 7817 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 10/19/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 8/21/2012 | Treatment End Date: | 8/16/2012 | Treatment Summary: | Set CFP @ 7870'. 08-04-12
Frac'd the Niobrara 7,648-7,654’; 7,806-7817’ (88 holes), w/ 101,244 gals 18 # pHaser
Hybrid cross linked gel containing 248,050 # 30/50 sand. 08-06-12 | Total fluid used in treatment (bbls): | 3409 | Max pressure during treatment (psi): | 5361 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.43 | Recycled water used in treatment (bbls): | 3409 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 250600 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7648 ft. | # Of Holes: | 88 | Interval Bottom: | 7817 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 11/17/2022 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|