Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06631
Well Classification: OW Status: PA - 7/1/2019
Well Name/No:CANYON CREEK #34-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/1/2019
FacilityID:415309LocationID:415299
Municipality/County:ERIE / BOULDER #013Location:NWSE 13 1N69W 6
Field:WATTENBERG - #90750Elevation:5058 ft.
Planned Location:2060FSL  2159 FELLat/Long: 40.049610 / -105.063200Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.049623 / -105.063202Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/31/2012
End Date: 7/31/2012
Reported: 9/13/2012
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/1/2019             Measured TD: 8590 ft.    Vertical TD: 8377 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/1/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/10/2013
Proposed Top PZ Location:Sec:13 Twp: 1N 69W Footage: 672 FSL  2021 FEL
Bottom Hole Location:Sec:13 Twp: 1N 69W Footage: 677 FSL  2007 FEL
Proposed Depth/Form:8611 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-32 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 790 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 0 ft., Bottom: 790 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8611 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 310, Top: 7349 ft., Bottom: 8611 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5515 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 260, Top: 4434 ft., Bottom: 5515 ft.

Wellbore Completed
Completion Date:6/16/2012
Spud Date:6/11/2012Spud Date Is:ACTUAL
Measured TD:8590 ft.Measured PB depth:8520 ft.
True Vertical TD:8377 ft.True Vertical PB depth:8307 ft.
Top PZ Location:Sec:13 Twp: 1N 69WFootage: 672 FSL  2021 FEL
Bottom Hole Location:Sec:13 Twp: 1N 69WFootage: 677 S  2007 E
Log Types:CBL
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 192 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: 155, Top: 0 ft., Bottom: 192 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 839 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 839 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8580 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 680, Top: 3785 ft., Bottom: 8590 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4696 ft.
NIOBRARA7607 ft.
CODELL8033 ft.
J SAND8447 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 7/1/2019                  Interval Top: 8459 ft.    Interval Bottom: 8475 ft.

 Completed Information for Formation J SAND
1st Production Date:10/19/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/21/2012Treatment End Date:8/10/2012
Treatment Summary:Frac'd J-Sand 8,459’ – 8,475’, (48 holes)w/ 64,881 gal 18 # pHaser Hybrid cross linked gel containing 251,000 # 20/40 Sand. 07-30-12
Total fluid used in treatment (bbls):3816Max pressure during treatment (psi):4058
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):3816Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):251000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8459 ft.# Of Holes:48
Interval Bottom:8475 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/7/2013                  Interval Top: 8034 ft.    Interval Bottom: 8048 ft.

 Completed Information for Formation CODELL
1st Production Date:10/19/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/21/2012Treatment End Date:8/10/2012
Treatment Summary:Set CF @ 8269'. 07-30-12 Frac'd the Codell 8,034’ – 8,048’ (42 holes) w/ 88,977 gal 22# pHaser Hybrid cross linked gel containing 252,630 # 30/50 sand. 07-30-12
Total fluid used in treatment (bbls):2776Max pressure during treatment (psi):4918
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):2776Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):257882Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8034 ft.# Of Holes:42
Interval Bottom:8048 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 10/31/2012                Interval Top: 7615 ft.    Interval Bottom: 8475 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:10/19/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/31/2012Treatment End Date:N/A
Treatment Summary:Set CBP @ 7570'. 08-09-12 Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 08-10-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8424 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/31/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 52
BBLS_OIL 43
BTU_GAS 1207
CALC_BBLS_H2O 52
CALC_BBLS_OIL 43
CALC_GOR 7674
CALC_MCF_GAS 330
CASING_PRESS 1458
GRAVITY_OIL 52
MCF_GAS 330
TUBING_PRESS 750
Perforation Data:
Interval Top:7615 ft.# Of Holes:130
Interval Bottom:8475 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/1/2019                  Interval Top: 7615 ft.    Interval Bottom: 8048 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/19/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7615 ft.# Of Holes:82
Interval Bottom:8048 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 2/7/2013                  Interval Top: 7615 ft.    Interval Bottom: 7786 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/19/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/21/2012Treatment End Date:8/10/2012
Treatment Summary:Set CFP @ 7850'. 07-31-12 Frac'd the Niobrara 7,615’ – 7,619’; 7,780’-7,786’ (40 holes), w/ 94,556 gals 18 # pHaser Hybrid cross linked gel containing 212,000 # 30/50 sand. 07-31-12
Total fluid used in treatment (bbls):3192Max pressure during treatment (psi):5187
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.75
Recycled water used in treatment (bbls):3192Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):213492Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7615 ft.# Of Holes:40
Interval Bottom:7786 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/01/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No