|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 2/10/2023 Measured TD: 8377 ft. Vertical TD: 8368 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 2/10/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 12/10/2013 | Proposed Top PZ Location: | Sec:13 Twp: 1N 69W | Footage: 2010 FSL 1984 FEL | Bottom Hole Location: | Sec:13 Twp: 1N 69W | Footage: 1972 FSL 1948 FEL | Proposed Depth/Form: | 8611 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-32 , Unit Acreage: 160, Drill Unit: SE4 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 790 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 280, Top: 0 ft., Bottom: 790 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8413 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 300, Top: 7273 ft., Bottom: 8413 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5373 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 250, Top: 4313 ft., Bottom: 5373 ft. |
| | |
Wellbore Completed | Completion Date: | 6/21/2012 | Spud Date: | 6/16/2012 | Spud Date Is: | ACTUAL | Measured TD: | 8377 ft. | Measured PB depth: | 8316 ft. | True Vertical TD: | 8368 ft. | True Vertical PB depth: | 8307 ft. | Top PZ Location: | Sec:13 Twp: 1N 69W | Footage: 2010 FSL 1984 FEL | Bottom Hole Location: | Sec:13 Twp: 1N 69W | Footage: 1972 S 1948 E | Log Types: | CBL, High Resolution Ind/Compensated Density/Compensated Neutron | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 183 ft., Weight: NA , Citings Type: ACTUAL | Cement: | Sacks: , Top: 0 ft., Bottom: 183 ft., Determination Method: CALC | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 839 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 430, Top: 0 ft., Bottom: 850 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8367 ft., Weight: 11.60 , Citings Type: ACTUAL | Cement: | Sacks: 680, Top: 3350 ft., Bottom: 8377 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4521 ft. | | | | NIOBRARA | 7488 ft. | | | | CODELL | 7833 ft. | | | | J SAND | 8264 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 2/10/2023 Interval Top: 8276 ft. Interval Bottom: 8292 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/20/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/21/2012 | Treatment End Date: | 8/12/2012 | Treatment Summary: | Frac'd the J-Sand 8,276’ – 8,292’, (48 holes)w/ 65,579 gal 18 # pHaser Hybrid
cross linked gel containing 252,900 # 20/40 Sand. 08-01-12 | Total fluid used in treatment (bbls): | 3841 | Max pressure during treatment (psi): | 3938 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.75 | Recycled water used in treatment (bbls): | 3841 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 252919 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8276 ft. | # Of Holes: | 48 | Interval Bottom: | 8292 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 2/7/2013 Interval Top: 7834 ft. Interval Bottom: 7848 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/20/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/21/2012 | Treatment End Date: | 8/12/2012 | Treatment Summary: | Set CFP @ 8053'. 08-01-12
Frac'd the Codell 7,834’ – 7,848’ (42 holes) w/ 88,437 gal 22# pHaser
Hybrid cross linked gel containing 248,740 # 20/40 sand. 08-01-12 | Total fluid used in treatment (bbls): | 2760 | Max pressure during treatment (psi): | 4699 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.86 | Recycled water used in treatment (bbls): | 2760 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 248739 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7834 ft. | # Of Holes: | 42 | Interval Bottom: | 7848 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/31/2012 Interval Top: 7492 ft. Interval Bottom: 8292 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/20/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 10/31/2012 | Treatment End Date: | N/A | Treatment Summary: | Set CBP @ 7450'. 08-11-12
Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 08-12-12 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8237 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/31/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 48 | BBLS_OIL | 43 | BTU_GAS | 1207 | CALC_BBLS_H2O | 48 | CALC_BBLS_OIL | 43 | CALC_GOR | 8465 | CALC_MCF_GAS | 364 | CASING_PRESS | 867 | GRAVITY_OIL | 52 | MCF_GAS | 364 | TUBING_PRESS | 419 |
| Perforation Data: | Interval Top: | 7492 ft. | # Of Holes: | 130 | Interval Bottom: | 8292 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 2/10/2023 Interval Top: 7492 ft. Interval Bottom: 7848 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/20/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7492 ft. | # Of Holes: | 82 | Interval Bottom: | 7848 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 2/7/2013 Interval Top: 7492 ft. Interval Bottom: 7592 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 10/20/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/21/2012 | Treatment End Date: | 8/12/2012 | Treatment Summary: | Set CFP @ 7650'. 08-02-12
Frac'd the Niobrara 7,580’ – 7,592’; 7,492’-7,496’ (48 holes)Pumped 500 gals 15% HCL displaced over perfs.
SD due to Blender breaking down. Replaced Blender.Pumped 709 bbls slickwater pad, Pumped 343 bbl xlinked gel pad
Pumped 1# sand. 08-03-12 | Total fluid used in treatment (bbls): | 4328 | Max pressure during treatment (psi): | 6692 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.80 | Recycled water used in treatment (bbls): | 4328 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 46600 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7492 ft. | # Of Holes: | 48 | Interval Bottom: | 7592 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 02/10/2023 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|