|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/1/2019 Measured TD: 8872 ft. Vertical TD: 8381 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/1/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 12/10/2013 | Proposed Top PZ Location: | Sec:13 Twp: 1N 69W | Footage: 538 FSL 556 FEL | Bottom Hole Location: | Sec:13 Twp: 1N 69W | Footage: 559 FSL 522 FEL | Proposed Depth/Form: | 8779 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-32 , Unit Acreage: 160, Drill Unit: SE4 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 790 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 280, Top: 0 ft., Bottom: 790 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8779 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 10, Top: 7604 ft., Bottom: 8779 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5633 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 250, Top: 4581 ft., Bottom: 5633 ft. |
| | |
Wellbore Completed | Completion Date: | 6/26/2012 | Spud Date: | 6/22/2012 | Spud Date Is: | ACTUAL | Measured TD: | 8872 ft. | Measured PB depth: | 8816 ft. | True Vertical TD: | 8381 ft. | True Vertical PB depth: | 8325 ft. | Top PZ Location: | Sec:13 Twp: 1N 69W | Footage: 538 FSL 556 FEL | Bottom Hole Location: | Sec:13 Twp: 1N 69W | Footage: 559 S 522 E | Log Types: | CBL | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 195 ft., Weight: 84 , Citings Type: ACTUAL | Cement: | Sacks: 155, Top: 0 ft., Bottom: 195 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 840 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 430, Top: 0 ft., Bottom: 850 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8858 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 700, Top: 4300 ft., Bottom: 8872 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4901 ft. | | | | NIOBRARA | 7948 ft. | | | | CODELL | 8352 ft. | | | | J SAND | 8751 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 7/1/2019 Interval Top: 8764 ft. Interval Bottom: 8780 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/12/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/21/2012 | Treatment End Date: | 8/14/2012 | Treatment Summary: | Frac''d the J-Sand 8,764’ – 8,780’, (48 holes)w/ 66,210 gal 18 # pHaser Hybrid
cross linked gel containing 251,900 # 20/40 Sand. 08-01-12 | Total fluid used in treatment (bbls): | 3841 | Max pressure during treatment (psi): | 3884 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.72 | Recycled water used in treatment (bbls): | 3841 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 253029 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8764 ft. | # Of Holes: | 48 | Interval Bottom: | 8780 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 3/7/2013 Interval Top: 8353 ft. Interval Bottom: 8367 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/12/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/21/2012 | Treatment End Date: | 8/14/2012 | Treatment Summary: | Set CFP @ 8546'. 08-01-12
Frac'd the Codell 8,353’ – 8,367’ (42 holes) w/ 38,442 gal 22# pHaser
Hybrid cross linked gel containing 54,300 # 20/40 sand. 08-01-12 | Total fluid used in treatment (bbls): | 1626 | Max pressure during treatment (psi): | 6060 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.87 | Recycled water used in treatment (bbls): | 1626 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 54307 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8353 ft. | # Of Holes: | 42 | Interval Bottom: | 8367 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/31/2012 Interval Top: 7955 ft. Interval Bottom: 8780 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/12/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 10/31/2012 | Treatment End Date: | N/A | Treatment Summary: | Set CBP @ 7910'. 08-13-12
Drilled out CBP and CFP's to coommingle the JSND-NBRR-CDL. 08-14-12 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8726 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/31/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 48 | BBLS_OIL | 43 | BTU_GAS | 1207 | CALC_BBLS_H2O | 48 | CALC_BBLS_OIL | 43 | CALC_GOR | 8465 | CALC_MCF_GAS | 364 | CASING_PRESS | 1147 | GRAVITY_OIL | 52 | MCF_GAS | 364 | TUBING_PRESS | 322 |
| Perforation Data: | Interval Top: | 7955 ft. | # Of Holes: | 130 | Interval Bottom: | 8780 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/1/2019 Interval Top: 7955 ft. Interval Bottom: 8367 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/12/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7955 ft. | # Of Holes: | 82 | Interval Bottom: | 8367 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 3/7/2013 Interval Top: 7955 ft. Interval Bottom: 8122 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 10/12/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/21/2012 | Treatment End Date: | 8/14/2012 | Treatment Summary: | Set CFP @ 8190'. 08-02-12
Frac'd the Niobrara 7,955-7,959’; 8,116-8,122’ (40 holes), w/ 102,173 gals 18 # pHaser
Hybrid cross linked gel containing 250,093 # 30/50 sand. 08-03-12 | Total fluid used in treatment (bbls): | 3395 | Max pressure during treatment (psi): | 5013 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.77 | Recycled water used in treatment (bbls): | 3395 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 252141 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7955 ft. | # Of Holes: | 40 | Interval Bottom: | 8122 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 07/01/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|