Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06625
Well Classification: GW Status: PR - 5/18/2011
Well Name/No:BAILEY #31-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/18/2011
FacilityID:414716LocationID:414720
County:BOULDER #013Location:NWNE 12 1N69W 6
Field:WATTENBERG - #90750Elevation:4980 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:657FNL  2000 FELLat/Long: 40.071270 / -105.062600Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.071273 / -105.062602Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/18/2011             Measured TD: 8334 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/18/2011
Wellbore Permit
Permit #: Expiration Date:12/3/2011
Proposed Depth/Form:8288 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 550 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 550 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8288 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 7158 ft., Bottom: 8288 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5190 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 240, Top: 4185 ft., Bottom: 5190 ft.

Wellbore Completed
Completion Date:10/16/2010
Spud Date:10/11/2010Spud Date Is:ACTUAL
Measured TD:8334 ft.Measured PB depth:8270 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 870 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 326, Top: 0 ft., Bottom: 870 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8317 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 3740 ft., Bottom: 8317 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4362 ft.
NIOBRARA7360 ft.
CODELL7720 ft.

Formation JSND                     Formation Classification:                       Status:  PR - 5/18/2011                 Interval Top: 8142 ft.    Interval Bottom: 8170 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/2/2010
Treatment Summary:J SAND COMPLETION FRAC'D THE J-SAND WITH 153,090 GALS 18# VISTAR HYBID CROSS LINKED GEL CONTAINING 251,200# 20/40 SAND 11-20-10
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8142 ft.# Of Holes:48
Interval Bottom:8170 ft.Hole Size:0.4 in.

Formation JNBCD                   Formation Classification:                     Status:  CM - 11/22/2010                Interval Top: 7480 ft.    Interval Bottom: 8170 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size:0.000 in.
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/20/2010
Treatment Summary:JSND-CDL-NBRR COMMINGLE SET CBP @ 7400', 11-15-10 DRILLED OUT CBP @ 7400', CFP @ 7610', CFP @ 7820', TO COMMINGLE THE JSND-CDL-NBRR 11-16-10
Tubing Size:2.375 in.Tubing Setting Depth:8124 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/22/2010Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 38
BBLS_OIL 40
BTU_GAS 1326
CALC_BBLS_H2O 38
CALC_BBLS_OIL 40
CALC_GOR 7325
CALC_MCF_GAS 293
CASING_PRESS 1682
GRAVITY_OIL 49
MCF_GAS 293
TUBING_PRESS 877
Perforation Data:
Interval Top:7480 ft.# Of Holes:124
Interval Bottom:8170 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:                     Status:  PR - 5/18/2011                 Interval Top: 7480 ft.    Interval Bottom: 7738 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/20/2010
Treatment Summary:CDL-MBRR COMPLETION SET CFP @ 7820', 11-02-10 FRAC'D TJE CPDE;; WITH 109,494 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,460# 30/50 SAND. 11-02-10 SET CFP @ 7610', 11-03-10 FRAC'D THE NIOBRARA WITH 141,999 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,820# 30/50 SAND 11-03-10
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7480 ft.# Of Holes:76
Interval Bottom:7738 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)783
Total Gas Produced (MCF)10523
GOR13439
GOR DeterminationBOE
Average BOE per Day7.118
Average MCFE per Day41.288

 Federal Financial Assurance  i 

 Tribal Well  i No