|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2025 Measured TD: 8671 ft. Vertical TD: 8597 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2025 | Wellbore Permit | DIRECTIONAL | Permit #: | 20091699 | Expiration Date: | 6/23/2010 | Proposed Top PZ Location: | Sec:26 Twp: 1N 69W | Footage: 2020 FNL 713 FWL | Bottom Hole Location: | Sec:26 Twp: 1N 69W | Footage: 2020 FNL 713 FWL | Proposed Depth/Form: | 8684 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW/4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: NW/4 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW/4 |
| | |
Wellbore Completed | Completion Date: | 8/14/2009 | Spud Date: | 8/8/2009 | Spud Date Is: | ACTUAL | Measured TD: | 8671 ft. | Measured PB depth: | 8617 ft. | True Vertical TD: | 8597 ft. | True Vertical PB depth: | 8544 ft. | Top PZ Location: | Sec:26 Twp: 1N 69W | Footage: 2020 FNL 713 FWL | Bottom Hole Location: | Sec:26 Twp: 1N 69W | Footage: 2020 FNL 713 FWL | Log Types: | CBL/GR/CCL,DSN/SDL/ACL/TRL,CSL/NGRL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 808 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 261, Top: 0 ft., Bottom: 818 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8658 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 1775, Top: 1306 ft., Bottom: 8670 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4277 ft. | | N | N | NIOBRARA | 7664 ft. | | N | N | FORT HAYS | 8059 ft. | | N | N | CODELL | 8080 ft. | | N | N | GREENHORN | 8171 ft. | | N | N | D SAND | 8429 ft. | | N | N | MOWRY | 8478 ft. | | N | N | J SAND | 8492 ft. | | N | N | J-3 SAND | 8501 ft. | | N | N |
Formation JSND Formation Classification: OW Status: PR - 5/1/2025 Interval Top: 8506 ft. Interval Bottom: 8514 ft. Completed Information for Formation J SAND | 1st Production Date: | 12/1/2009 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/17/2009 | Treatment Summary: | FRAC'D J-SAND W/ 197358 GALS OF SILVERSTIM AND SLICK WATER WITH 334,920 #'S OF OTTAWA SAND. J-SAND IS PRODUCING THROUGH A COMPOSITE FLOW THROUGH PLUG. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8506 ft. | # Of Holes: | 32 | Interval Bottom: | 8514 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 2/11/2009 Interval Top: 7702 ft. Interval Bottom: 8514 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | 0.219 in. | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/11/2009 | Treatment Summary: | COMMINGLED NIOBRARA/CODELL/J-SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/11/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 120 | BBLS_OIL | 98 | BTU_GAS | 1250 | CALC_BBLS_H2O | 120 | CALC_BBLS_OIL | 98 | CALC_GOR | 3520 | CALC_MCF_GAS | 345 | CASING_PRESS | 700 | GRAVITY_OIL | 48 | MCF_GAS | 345 | TUBING_PRESS | 0 |
| Perforation Data: | Interval Top: | 7702 ft. | # Of Holes: | 128 | Interval Bottom: | 8514 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: PR - 5/1/2025 Interval Top: 7702 ft. Interval Bottom: 7844 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/12/2009 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/17/2009 | Treatment Summary: | NB FRAC: 7702-7844; 48 HOLES@ .73". FRAC'D NB W/ 175686 GALS SILVERSTIM & SLICK WATER W/250,000 #'S OTTAWA SAND. CD PERF: 8081-8093; 48 HOLES@ .41". FRAC CD W/ 133476 GALS SILVERSTIM & SLICK WATER W/270,340 #'S OTTAWA SAND. CDL IS PROD THROUGH A |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7702 ft. | # Of Holes: | 48 | Interval Bottom: | 7844 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 16 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.009 |
Average MCFE per Day | 0.046 |
Federal Financial Assurance | i | |
|
|