Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06599
Well Classification: GW Status: PR - 8/1/2025
Well Name/No:DEASON #4-2-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2025
FacilityID:300653LocationID:336166
County:BOULDER #013Location:NENW 36 2N69W 6
Field:WATTENBERG - #90750Elevation:5016 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1004FNL  1929 FWLLat/Long: 40.100110 / -105.067450Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.100104 / -105.067445Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/16/2012
End Date: 9/17/2012
Reported: 12/13/2012
Days to report: 87
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2025             Measured TD: 7878 ft.    Vertical TD: 7801 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/19/2014
Proposed Top PZ Location:Sec:36 Twp: 2N 69W Footage: 1378 FNL  2633 FWL
Bottom Hole Location:Sec:36 Twp: 2N 69W Footage: 1381 FNL  2641 FWL
Proposed Depth/Form:8247 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 273, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8247 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 176, Top: 7151 ft., Bottom: 8247 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5186 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 151, Top: 4085 ft., Bottom: 5186 ft.

Wellbore Completed
Completion Date:9/2/2012
Spud Date:8/28/2012Spud Date Is:ACTUAL
Measured TD:7878 ft.Measured PB depth:7824 ft.
True Vertical TD:7801 ft.True Vertical PB depth:7747 ft.
Top PZ Location:Sec:36 Twp: 2N 69WFootage: 1378 FNL  2633 FWL
Bottom Hole Location:Sec:36 Twp: 2N 69WFootage: 1381 FNL  2641 FWL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 793 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 804 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7866 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 678, Top: 3220 ft., Bottom: 8060 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4307 ft.
NIOBRARA7371 ft.
CODELL7681 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/12/2013                 Interval Top: 7682 ft.    Interval Bottom: 7696 ft.

 Completed Information for Formation CODELL
1st Production Date:10/13/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/13/2012Treatment End Date:9/26/2012
Treatment Summary:Frac'd the Codell 7682'-7696’ (42 holes) w/ 87,066 gal 22# Vistar Hybrid cross linked gel containing 250,400 # 30/50 sand. 09-16-12
Total fluid used in treatment (bbls):2695Max pressure during treatment (psi):4426
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.69
Recycled water used in treatment (bbls):2695Total flowback volume recovered (bbls):423
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7682 ft.# Of Holes:42
Interval Bottom:7696 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  PR - 8/1/2025                  Interval Top: 7449 ft.    Interval Bottom: 7696 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/13/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/14/2012Treatment End Date:N/A
Treatment Summary:Set CBP @ 7420'. 09-25-12 Drilled out CBP and CFP's to commingle the NBRR-CDL. 09-26-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7644 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/14/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 73
BBLS_OIL 103
BTU_GAS 1269
CALC_BBLS_H2O 73
CALC_BBLS_OIL 103
CALC_GOR 3349
CALC_MCF_GAS 345
CASING_PRESS 2207
GRAVITY_OIL 52
MCF_GAS 345
TUBING_PRESS 1010
Perforation Data:
Interval Top:7449 ft.# Of Holes:90
Interval Bottom:7696 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/12/2013                 Interval Top: 7449 ft.    Interval Bottom: 7461 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/13/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/13/2012Treatment End Date:9/25/2012
Treatment Summary:Set CFP @ 7510'. 09-17-12 Frac'd the Niobrara 7449'-7461', (48 holes), w/ 96,558 gals 18 # Vistar Hybrid cross linked gel containing 250,820 # 30/50 sand. 09-17-12
Total fluid used in treatment (bbls):3201Max pressure during treatment (psi):4408
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):3201Total flowback volume recovered (bbls):423
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250820Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7449 ft.# Of Holes:48
Interval Bottom:7461 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)38
Total Gas Produced (MCF)602
GOR15842
GOR DeterminationMCFE
Average BOE per Day0.385
Average MCFE per Day2.232

 Federal Financial Assurance  i 

 Tribal Well  i No