Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06599
Well Classification: GW Status: SI - 5/1/2025
Well Name/No:DEASON #4-2-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2025
FacilityID:300653LocationID:336166
County:BOULDER #013Location:NENW 36 2N69W 6
Field:WATTENBERG - #90750Elevation:5016 ft.
Planned Location:1004FNL  1929 FWLLat/Long: 40.100110 / -105.067450Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.100104 / -105.067445Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/16/2012
End Date: 9/17/2012
Reported: 12/13/2012
Days to report: 87
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 5/1/2025             Measured TD: 7878 ft.    Vertical TD: 7801 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 5/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/19/2014
Proposed Top PZ Location:Sec:36 Twp: 2N 69W Footage: 1378 FNL  2633 FWL
Bottom Hole Location:Sec:36 Twp: 2N 69W Footage: 1381 FNL  2641 FWL
Proposed Depth/Form:8247 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 273, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8247 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 176, Top: 7151 ft., Bottom: 8247 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5186 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 151, Top: 4085 ft., Bottom: 5186 ft.

Wellbore Completed
Completion Date:9/2/2012
Spud Date:8/28/2012Spud Date Is:ACTUAL
Measured TD:7878 ft.Measured PB depth:7824 ft.
True Vertical TD:7801 ft.True Vertical PB depth:7747 ft.
Top PZ Location:Sec:36 Twp: 2N 69WFootage: 1378 FNL  2633 FWL
Bottom Hole Location:Sec:36 Twp: 2N 69WFootage: 1381 FNL  2641 FWL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 793 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 804 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7866 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 678, Top: 3220 ft., Bottom: 8060 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4307 ft.
NIOBRARA7371 ft.
CODELL7681 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/12/2013                 Interval Top: 7682 ft.    Interval Bottom: 7696 ft.

 Completed Information for Formation CODELL
1st Production Date:10/13/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/13/2012Treatment End Date:9/26/2012
Treatment Summary:Frac'd the Codell 7682'-7696’ (42 holes) w/ 87,066 gal 22# Vistar Hybrid cross linked gel containing 250,400 # 30/50 sand. 09-16-12
Total fluid used in treatment (bbls):2695Max pressure during treatment (psi):4426
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.69
Recycled water used in treatment (bbls):2695Total flowback volume recovered (bbls):423
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7682 ft.# Of Holes:42
Interval Bottom:7696 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 5/1/2025                  Interval Top: 7449 ft.    Interval Bottom: 7696 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/13/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/14/2012Treatment End Date:N/A
Treatment Summary:Set CBP @ 7420'. 09-25-12 Drilled out CBP and CFP's to commingle the NBRR-CDL. 09-26-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7644 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/14/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 73
BBLS_OIL 103
BTU_GAS 1269
CALC_BBLS_H2O 73
CALC_BBLS_OIL 103
CALC_GOR 3349
CALC_MCF_GAS 345
CASING_PRESS 2207
GRAVITY_OIL 52
MCF_GAS 345
TUBING_PRESS 1010
Perforation Data:
Interval Top:7449 ft.# Of Holes:90
Interval Bottom:7696 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 3/12/2013                 Interval Top: 7449 ft.    Interval Bottom: 7461 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/13/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/13/2012Treatment End Date:9/25/2012
Treatment Summary:Set CFP @ 7510'. 09-17-12 Frac'd the Niobrara 7449'-7461', (48 holes), w/ 96,558 gals 18 # Vistar Hybrid cross linked gel containing 250,820 # 30/50 sand. 09-17-12
Total fluid used in treatment (bbls):3201Max pressure during treatment (psi):4408
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):3201Total flowback volume recovered (bbls):423
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250820Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7449 ft.# Of Holes:48
Interval Bottom:7461 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)312
Total Gas Produced (MCF)2650
GOR8493
GOR DeterminationBOE
Average BOE per Day2.100
Average MCFE per Day12.195

 Federal Financial Assurance  i 

 Tribal Well  i No