|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 4/1/2025 Measured TD: 8290 ft. Vertical TD: 8178 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 4/1/2025 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 1/19/2014 | Proposed Top PZ Location: | Sec:36 Twp: 2N 69W | Footage: 1995 FNL 1936 FWL | Bottom Hole Location: | Sec:36 Twp: 2N 69W | Footage: 1962 FNL 1956 FWL | Proposed Depth/Form: | 8278 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW/4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: NW/4 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NW/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 310, Top: 0 ft., Bottom: 850 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8278 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 177, Top: 7178 ft., Bottom: 8278 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5208 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 152, Top: 4103 ft., Bottom: 5208 ft. |
| | |
Wellbore Completed | Completion Date: | 8/19/2012 | Spud Date: | 8/13/2012 | Spud Date Is: | ACTUAL | Measured TD: | 8290 ft. | Measured PB depth: | 8228 ft. | True Vertical TD: | 8178 ft. | True Vertical PB depth: | 8116 ft. | Top PZ Location: | Sec:36 Twp: 2N 69W | Footage: 1995 FNL 1936 FWL | Bottom Hole Location: | Sec:36 Twp: 2N 69W | Footage: 1962 FNL 1956 FWL | Log Types: | CBL, Dual Ind/Compensated Density/Compensated Neutron | Casing: | String Type: SURF, Hole Size: 12 in., Size: 8.625 in., Top: 0 ft., Depth: 880 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 375, Top: 0 ft., Bottom: 890 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7 in., Size: 4.5 in., Top: 0 ft., Depth: 8276 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 720, Top: 3692 ft., Bottom: 8290 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4338 ft. | | | | NIOBRARA | 7420 ft. | | | | CODELL | 7716 ft. | | | | J SAND | 8148 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 4/1/2025 Interval Top: 8150 ft. Interval Bottom: 8179 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/14/2012 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 9/13/2012 | Treatment End Date: | 11/20/2012 | Treatment Summary: | Frac'd the J-Sand 8150'-8155’, 8160'-8179', (48 holes)w/ 64,680 gal 18 # Vistar
Hybrid cross linked gel containing 250,420 # 20/40 Sand. 09-14-12 | Total fluid used in treatment (bbls): | 3824 | Max pressure during treatment (psi): | 3695 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.57 | Recycled water used in treatment (bbls): | 3824 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 250420 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8150 ft. | # Of Holes: | 48 | Interval Bottom: | 8179 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 3/7/2013 Interval Top: 7718 ft. Interval Bottom: 7732 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/14/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 9/13/2012 | Treatment End Date: | 9/20/2012 | Treatment Summary: | Set CFP @ 7778'. 09-14-12
Frac'd the Codell 7718'-7732’ (42 holes) w/ 88,620 gal 22# Vistar Hybrid cross linked gel
containing 253,220 # 30/50 sand. 09-15-12 | Total fluid used in treatment (bbls): | 2732 | Max pressure during treatment (psi): | 5026 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.73 | Recycled water used in treatment (bbls): | 2732 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 253220 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7718 ft. | # Of Holes: | 42 | Interval Bottom: | 7732 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/14/2012 Interval Top: 7503 ft. Interval Bottom: 8179 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/14/2012 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 10/14/2012 | Treatment End Date: | N/A | Treatment Summary: | Set CBP @ 7470'. 09-19-12
Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 09-20-12 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8133 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/14/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 74 | BBLS_OIL | 85 | BTU_GAS | 1269 | CALC_BBLS_H2O | 74 | CALC_BBLS_OIL | 85 | CALC_GOR | 4871 | CALC_MCF_GAS | 414 | CASING_PRESS | 1984 | GRAVITY_OIL | 52 | MCF_GAS | 414 | TUBING_PRESS | 1361 |
| Perforation Data: | Interval Top: | 7503 ft. | # Of Holes: | 132 | Interval Bottom: | 8179 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 4/1/2025 Interval Top: 7503 ft. Interval Bottom: 7732 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/14/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7503 ft. | # Of Holes: | 90 | Interval Bottom: | 7732 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 3/7/2013 Interval Top: 7503 ft. Interval Bottom: 7515 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 10/14/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 9/13/2012 | Treatment End Date: | 9/20/2012 | Treatment Summary: | Set CFP @ 7565'. 09-15-12
Frac'd the Niobrara 7503-7515’, (48 holes), w/ 102,900 gals 18 # Vistar Hybrid cross linked
gel containing 250,640 # 30/50 sand. 09-17-12 | Total fluid used in treatment (bbls): | 3387 | Max pressure during treatment (psi): | 4396 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.76 | Recycled water used in treatment (bbls): | 3387 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 250640 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7503 ft. | # Of Holes: | 48 | Interval Bottom: | 7515 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | Y | Noticed Date 04/01/2025 |
Defined Inactive | N | |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 3 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.003 |
Average MCFE per Day | 0.008 |
Federal Financial Assurance | i | |
|
|