Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06597
Well Classification: GW Status: PR - 4/1/2023
Well Name/No:DEASON #2-4-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2023
FacilityID:300651LocationID:336166
County:BOULDER #013Location:NENW 36 2N69W 6
Field:WATTENBERG - #90750Elevation:5016 ft.
Planned Location:1024FNL  1928 FWLLat/Long: 40.100050 / -105.067450Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.100054 / -105.067448Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/16/2012
End Date: 9/16/2012
Reported: 11/3/2012
Days to report: 48
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2023             Measured TD: 8467 ft.    Vertical TD: 8167 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/19/2014
Proposed Top PZ Location:Sec:36 Twp: 2N 69W Footage: 2548 FNL  1315 FWL
Bottom Hole Location:Sec:36 Twp: 2N 69W Footage: 2549 FNL  1329 FWL
Proposed Depth/Form:8415 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 273, Top: 0 ft., Bottom: 750 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8415 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 175, Top: 7323 ft., Bottom: 8415 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5306 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 154, Top: 4186 ft., Bottom: 5306 ft.

Wellbore Completed
Completion Date:8/24/2012
Spud Date:8/8/2012Spud Date Is:ACTUAL
Measured TD:8467 ft.Measured PB depth:8400 ft.
True Vertical TD:8167 ft.True Vertical PB depth:8100 ft.
Top PZ Location:Sec:36 Twp: 2N 69WFootage: 2548 FNL  1315 FWL
Bottom Hole Location:Sec:36 Twp: 2N 69WFootage: 2549 FNL  1329 FWL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12 in., Size: 8.625 in., Top: 0 ft., Depth: 797 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 319, Top: 0 ft., Bottom: 807 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7 in., Size: 4.5 in., Top: 0 ft., Depth: 8453 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 3445 ft., Bottom: 8467 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4484 ft.
NIOBRARA7540 ft.
CODELL7900 ft.
J SAND8327 ft.

Formation JSND                     Formation Classification:  OW                     Status:  PR - 4/1/2023                  Interval Top: 8328 ft.    Interval Bottom: 8359 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/20/2012Treatment End Date:9/22/2012
Treatment Summary:Frac'd the J-Sand 8328-8333’, 8339-8359’, (50 holes)w/ 62,538 gal 18 # Vistar Hybrid cross linked gel containing 250,160 # 20/40 Sand. 09-14-12
Total fluid used in treatment (bbls):3779Max pressure during treatment (psi):4373
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.57
Recycled water used in treatment (bbls):3779Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250160Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8328 ft.# Of Holes:50
Interval Bottom:8359 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/15/2013                 Interval Top: 7901 ft.    Interval Bottom: 7915 ft.

 Completed Information for Formation CODELL
1st Production Date:10/14/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/20/2012Treatment End Date:9/22/2012
Treatment Summary:Set CFP @ 7970'. 09-15-12 Frac'd the Codell 7901-7915’ (42 holes) w/ 87,948 gal 22# Vistar Hybrid cross linked gel containing 251,320 # 30/50 sand. 09-16-12
Total fluid used in treatment (bbls):2718Max pressure during treatment (psi):4246
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.69
Recycled water used in treatment (bbls):2718Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):251340Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7901 ft.# Of Holes:42
Interval Bottom:7915 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 10/15/2012                Interval Top: 7661 ft.    Interval Bottom: 8359 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:10/14/2012Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/15/2012Treatment End Date:N/A
Treatment Summary:Set CBP @ 7620'. 09-21-12 Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 09-22-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8308 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/15/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 72
BBLS_OIL 103
BTU_GAS 1269
CALC_BBLS_H2O 72
CALC_BBLS_OIL 103
CALC_GOR 3350
CALC_MCF_GAS 345
CASING_PRESS 1975
GRAVITY_OIL 52
MCF_GAS 345
TUBING_PRESS 1936
Perforation Data:
Interval Top:7661 ft.# Of Holes:140
Interval Bottom:8359 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  PR - 4/1/2023                  Interval Top: 7661 ft.    Interval Bottom: 7915 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/14/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7661 ft.# Of Holes:90
Interval Bottom:7915 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 2/15/2013                 Interval Top: 7661 ft.    Interval Bottom: 7673 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/14/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/20/2012Treatment End Date:9/22/2012
Treatment Summary:Set CFP @ 7725'. 09-16-12 Frac'd the Niobrara 7661-7673, (48 holes), w/ 98,868 gals 18 # Vistar Hybrid cross linked gel containing 253,020 # 30/50 sand. 09-16-12
Total fluid used in treatment (bbls):3264Max pressure during treatment (psi):4443
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.78
Recycled water used in treatment (bbls):3264Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):251040Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7661 ft.# Of Holes:48
Interval Bottom:7673 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)546
Total Gas Produced (MCF)14884
GOR27260
GOR DeterminationMCFE
Average BOE per Day8.533
Average MCFE per Day49.465

 Federal Financial Assurance  i 

 Tribal Well  i No