Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06583
Well Classification: GW Status: PA - 7/26/2024
Well Name/No:SHAFFER NEWMAN #24-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/26/2024
FacilityID:295524LocationID:335913
County:BOULDER #013Location:SWSW 13 1N69W 6
Field:WATTENBERG - #90750Elevation:5112 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:477FSL  864 FWLLat/Long: 40.045360 / -105.071430Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.045379 / -105.071407Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 7/26/2024             Measured TD: 8560 ft.    Vertical TD: 8430 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 7/26/2024
Wellbore PermitDIRECTIONAL
Permit #:20091883 Expiration Date:5/27/2010
Proposed Top PZ Location:Sec:13 Twp: 1N 69W Footage: 537 FSL  2126 FWL
Bottom Hole Location:Sec:13 Twp: 1N 69W Footage: 537 FSL  2126 FWL
Proposed Depth/Form:8563 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: SW4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW4
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5476 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 220, Top: 4557 ft., Bottom: 5476 ft.

Wellbore Completed
Completion Date:4/14/2009
Spud Date:4/9/2009Spud Date Is:ACTUAL
Measured TD:8560 ft.Measured PB depth:8504 ft.
True Vertical TD:8430 ft.True Vertical PB depth:8374 ft.
Top PZ Location:Sec:13 Twp: 1N 69WFootage: 537 FSL  2126 FWL
Bottom Hole Location:Sec:13 Twp: 1N 69WFootage: 537 FSL  2126 FWL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 839 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 0 ft., Bottom: 839 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8539 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 6260 ft., Bottom: 8539 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7664 ft.NN
CODELL8046 ft.NN
J SAND8460 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 7/26/2024                 Interval Top: 8472 ft.    Interval Bottom: 8492 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/3/2009
Treatment Summary:J SAND COMPLETION. FRAC'D THE J SAND W/119,868 GAL VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,400# 20/40 SAND. 05/03/09.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_GOR 0
Perforation Data:
Interval Top:8472 ft.# Of Holes:80
Interval Bottom:8492 ft.Hole Size:0.41 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 1/10/2024                 Interval Top: 8046 ft.    Interval Bottom: 8062 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8046 ft.# Of Holes:32
Interval Bottom:8062 ft.Hole Size:0.41 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 5/26/2009                 Interval Top: 7834 ft.    Interval Bottom: 8492 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/14/2009
Treatment Summary:JSND-NBRR-CDL COMMINGLE: DRILLED OUT CFP @7950'. 05/20/2009 DRILLED OUT CFP @ 8150' TO COMMINGLE THE JSND-NBRR-CDL 05-21-09.
Tubing Size:2.375 in.Tubing Setting Depth:8444 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/26/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 155
BBLS_OIL 69
BTU_GAS 1301
CALC_BBLS_H2O 155
CALC_BBLS_OIL 69
CALC_GOR 4420
CALC_MCF_GAS 305
CASING_PRESS 1408
GRAVITY_OIL 50
MCF_GAS 305
TUBING_PRESS 646
Perforation Data:
Interval Top:7834 ft.# Of Holes:192
Interval Bottom:8492 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 7/26/2024                 Interval Top: 7834 ft.    Interval Bottom: 8062 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/3/2009
Treatment Summary:NBRR-CDL COMPLETION: SET CFP @8150'. 05/03/09. FRAC'D THE CODELL WITH 76,398 GAL VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,620# 20/40 SAND. 05/03/09. SET CFP @ 7950'. 05/03/09. FRAC'D THE NIOBRARA W/90,216 GAL VISTAR CROSS LINKED GEL CONT NEXT PAGE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 58
BBLS_OIL 34
BTU_GAS 1301
CALC_BBLS_H2O 58
CALC_BBLS_OIL 34
CALC_GOR 4324
CALC_MCF_GAS 147
CASING_PRESS 208
GRAVITY_OIL 50
MCF_GAS 147
Perforation Data:
Interval Top:7834 ft.# Of Holes:112
Interval Bottom:8062 ft.Hole Size:0.41 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/10/2024                 Interval Top: 7834 ft.    Interval Bottom: 7854 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7834 ft.# Of Holes:80
Interval Bottom:7854 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/26/2024
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No