|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/1/2025 Measured TD: 8490 ft. Vertical TD: 8470 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20081552 | Expiration Date: | 5/15/2009 | | Proposed Top PZ Location: | Sec:13 Twp: 1N 69W | Footage: 74 FSL 704 FWL | | Bottom Hole Location: | Sec:13 Twp: 1N 69W | Footage: 74 FSL 704 FWL | | Proposed Depth/Form: | 8481 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5401 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 4495 ft., Bottom: 5401 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/8/2009 | | Spud Date: | 4/3/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8490 ft. | Measured PB depth: | 8434 ft. | | True Vertical TD: | 8470 ft. | True Vertical PB depth: | 8414 ft. | | Top PZ Location: | Sec:13 Twp: 1N 69W | Footage: 74 FSL 704 FWL | | Bottom Hole Location: | Sec:13 Twp: 1N 69W | Footage: 74 FSL 704 FWL | | Log Types: | CBL, DUAL IND/COMP DENSITY/COMP NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 825 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 395, Top: 0 ft., Bottom: 825 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8475 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 340, Top: 6190 ft., Bottom: 8475 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4694 ft. | | N | N | | SHANNON | 5160 ft. | | N | N | | NIOBRARA | 7508 ft. | | N | N | | CODELL | 7922 ft. | | N | N | | J SAND | 8326 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 9/1/2025 Interval Top: 8336 ft. Interval Bottom: 8355 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/29/2009 | | Treatment Summary: | JSND COMPLETION: FRAC'D JSND W/ 156,618 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,700# SAND. 4/29/09 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8336 ft. | # Of Holes: | 40 | | Interval Bottom: | 8355 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/27/2009 Interval Top: 7674 ft. Interval Bottom: 8355 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/8/2009 | | Treatment Summary: | JSND-NBR-CODL COMMINGLE. DRILLED OUT CFP @ 7760'. 5/18/09. DRILLED OUT CFP @ 8040' TO COMMINGLE THE JSND-NBRR-CODL. 5/19/09 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8318 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/27/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 198 | | BBLS_OIL | 100 | | BTU_GAS | 2573 | | CALC_BBLS_H2O | 198 | | CALC_BBLS_OIL | 100 | | CALC_GOR | 9390 | | CALC_MCF_GAS | 939 | | CASING_PRESS | 1645 | | GRAVITY_OIL | 50 | | MCF_GAS | 939 | | TUBING_PRESS | 1072 |
| | Perforation Data: | | Interval Top: | 7674 ft. | # Of Holes: | 152 | | Interval Bottom: | 8355 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 9/1/2025 Interval Top: 7674 ft. Interval Bottom: 7940 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/29/2009 | | Treatment Summary: | NBCD COMPLETION. SET CFP@ 8040'. FRAC'D CODL W/ 110,040 GAL 26# - 20# VISTAR HYBRID CROSSLINKD GEL CONTAINING 250,760# 20/40 SND. SET CFP @ 7760'. FRAC'D NBRR W/ 135,996 GAL 20#-18# VISTAR CROSSLINKD GEL CONTAINING 250,580# 20/40 SND. 4/29/09 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/3/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 120 | | BBLS_OIL | 164 | | BTU_GAS | 2573 | | CALC_BBLS_H2O | 120 | | CALC_BBLS_OIL | 164 | | CALC_GOR | 5189 | | CALC_MCF_GAS | 851 | | CASING_PRESS | 1513 | | GRAVITY_OIL | 50 | | MCF_GAS | 851 |
| | Perforation Data: | | Interval Top: | 7674 ft. | # Of Holes: | 112 | | Interval Bottom: | 7940 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 531 |
| Total Gas Produced (MCF) | 10248 |
| GOR | 19299 |
| GOR Determination | MCFE |
| Average BOE per Day | 6.320 |
| Average MCFE per Day | 36.657 |
| Federal Financial Assurance | i | |
|
|