Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06577
Well Classification: GW Status: PR - 5/1/2020
Well Name/No:LUMRY #6-0-24
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2020
FacilityID:343LocationID:335576
Municipality/County:ERIE / BOULDER #013Location:NENE 24 1N69W 6
Field:WATTENBERG - #90750Elevation:5081 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:863FNL  990 FELLat/Long: 40.041540 / -105.058990Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.041540 / -105.058991Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2020             Measured TD: 8505 ft.    Vertical TD: 7994 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2020
Wellbore PermitDIRECTIONAL
Permit #:20076403 Expiration Date:2/6/2009
Proposed Top PZ Location:Sec: Twp: Footage: 50 FNL  1320 FEL
Bottom Hole Location:Sec:24 Twp: 1N 69W Footage: 50 FNL  1320 FEL
Proposed Depth/Form:8498 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:6/6/2008
Spud Date:5/29/2008Spud Date Is:ACTUAL
Measured TD:8505 ft.Measured PB depth:8407 ft.
True Vertical TD:7994 ft.True Vertical PB depth:8345 ft.
Top PZ Location:Sec:24 Twp: 1N 69WFootage: 67 FNL  1283 FEL
Bottom Hole Location:Sec:24 Twp: 1N 69WFootage: 67 FNL  1283 FEL
Log Types:CBL, DUAL IND/COMP.DENSITY/COMP.NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 850 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8491 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 335, Top: 6724 ft., Bottom: 8491 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4600 ft.NN
SHANNON5229 ft.NN
NIOBRARA7493 ft.NN
CODELL7923 ft.NN
J SAND8346 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  PR - 5/1/2020                  Interval Top: 8358 ft.    Interval Bottom: 8374 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/25/2008
Treatment Summary:JSND COMPLETION. FRAC'D JSND W/ 153694 GAL 20# TO 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 254380# SD. 6/25/08
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8358 ft.# Of Holes:32
Interval Bottom:8374 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 8/8/2008                  Interval Top: 7665 ft.    Interval Bottom: 8374 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/6/2008
Treatment Summary:JSND-NBRR-CODL COMMINGLE. DRILLED UP CFP @ 7850' AND 8030' TO COMMINGLE THE JSND- NBRR-CODL. 8/3/08
Tubing Size:2.375 in.Tubing Setting Depth:8329 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/8/2008Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 85
BBLS_OIL 66
BTU_GAS 1261
CALC_BBLS_H2O 85
CALC_BBLS_OIL 66
CALC_GOR 2515
CALC_MCF_GAS 166
CASING_PRESS 1272
GRAVITY_OIL 48
MCF_GAS 166
TUBING_PRESS 343
Perforation Data:
Interval Top:7665 ft.# Of Holes:
Interval Bottom:8374 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 5/1/2020                  Interval Top: 7665 ft.    Interval Bottom: 7942 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/25/2008
Treatment Summary:NBRR-CDL RECOMPLETION. SET CFP @ 8030'. 6/25/08. FRAC'D CDL W/ 107856 GAL 24# TO 18# VISTAR HYBRID CROSSLINKED GEL CONTAINING 255200# SD. 6/25/08. SET CFP @ 7850'. 6/25/08. FRAC'D NBRR W 138768 GAL 18# VISTAR CROSSLINKED GEL HYBRID CONT. 257180# SD
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/30/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 115
BBLS_OIL 73
BTU_GAS 1000
CALC_BBLS_OIL 73
CALC_GOR 5260
CALC_MCF_GAS 384
CASING_PRESS 710
GRAVITY_OIL 50
MCF_GAS 384
Perforation Data:
Interval Top:7665 ft.# Of Holes:108
Interval Bottom:7942 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)429
Total Gas Produced (MCF)7108
GOR16568
GOR DeterminationMCFE
Average BOE per Day4.394
Average MCFE per Day25.505

 Federal Financial Assurance  i 

 Tribal Well  i No