Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06575
Well Classification: GW Status: PR - 5/1/2020
Well Name/No:LUMRY #6-4-24
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2020
FacilityID:332LocationID:335576
Municipality/County:ERIE / BOULDER #013Location:NENE 24 1N69W 6
Field:WATTENBERG - #90750Elevation:5081 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:884FNL  1015 FELLat/Long: 40.041490 / -105.059080Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.041464 / -105.059092Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2020             Measured TD: 8710 ft.    Vertical TD: 8463 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2020
Wellbore PermitDIRECTIONAL
Permit #:20076388 Expiration Date:2/5/2009
Proposed Top PZ Location:Sec:24 Twp: 1N 69W Footage: 2554 FNL  1307 FEL
Bottom Hole Location:Sec:24 Twp: 1N 69W Footage: 2554 FNL  1307 FEL
Proposed Depth/Form:8750 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: S2S
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: S2S
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: S2S

Wellbore Completed
Completion Date:5/17/2008
Spud Date:5/10/2008Spud Date Is:ACTUAL
Measured TD:8710 ft.Measured PB depth:8604 ft.
True Vertical TD:8463 ft.True Vertical PB depth:8357 ft.
Top PZ Location:Sec:24 Twp: 1N 69WFootage: 2554 FNL  1307 FEL
Bottom Hole Location:Sec:24 Twp: 1N 69WFootage: 2554 FNL  1307 FEL
Log Types:CBL, DUAL IND/COMP DENSITY/COMP NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 856 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 856 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8695 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 6934 ft., Bottom: 8695 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4749 ft.NN
SHANNON5394 ft.NN
NIOBRARA7718 ft.NN
CODELL8112 ft.NN
J SAND8524 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  PR - 5/1/2020                  Interval Top: 8536 ft.    Interval Bottom: 8552 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/22/2008
Treatment Summary:JSND COMPLETION. FRAC'D THE J SAND WITH 155,442 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 258,168# SAND. 06/22/08
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8536 ft.# Of Holes:32
Interval Bottom:8552 ft.Hole Size:0.41 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 7/19/2008                 Interval Top: 7724 ft.    Interval Bottom: 8552 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/17/2008
Treatment Summary:JSND-NB-CD COMMINGLE. DRILLED UP CFP @ 7850', 07/14/08. DRILLED UP CFP @ 8250' TO COMMINGLE THE JSND-NB-CD 07/15/08.
Tubing Size:2.375 in.Tubing Setting Depth:8509 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/19/2008Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 67
BBLS_OIL 35
BTU_GAS 1000
CALC_BBLS_H2O 67
CALC_BBLS_OIL 35
CALC_GOR 3686
CALC_MCF_GAS 129
CASING_PRESS 1383
GRAVITY_OIL 49
MCF_GAS 129
TUBING_PRESS 295
Perforation Data:
Interval Top:7724 ft.# Of Holes:140
Interval Bottom:8552 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 5/1/2020                  Interval Top: 7724 ft.    Interval Bottom: 8131 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/17/2008
Treatment Summary:NB-CD RECOMPLETION. SET CFP @8250', FRAC'D THE CD WITH 107,100 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 253,000# SAND 06/22/08. SET CFP @7850', FRAC'D THE NB WITH 142,170 GAL 18# VISTAR CROSS LINKED GEL HYBRID CONTAINING 254,160# SAND 06/22/08.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7724 ft.# Of Holes:108
Interval Bottom:8131 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)374
Total Gas Produced (MCF)4132
GOR11048
GOR DeterminationBOE
Average BOE per Day2.590
Average MCFE per Day15.016

 Federal Financial Assurance  i 

 Tribal Well  i No