|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2020 Measured TD: 8549 ft. Vertical TD: 8457 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20076404 | Expiration Date: | 2/5/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1320 FNL 50 FEL | | Bottom Hole Location: | Sec:24 Twp: 1N 69W | Footage: 1320 FNL 50 FEL | | Proposed Depth/Form: | 8544 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 6/13/2008 | | Spud Date: | 6/6/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8549 ft. | Measured PB depth: | 8504 ft. | | True Vertical TD: | 8457 ft. | True Vertical PB depth: | 8412 ft. | | Top PZ Location: | Sec:24 Twp: 1N 69W | Footage: 1324 FNL 52 FEL | | Bottom Hole Location: | Sec:24 Twp: 1N 69W | Footage: 1324 FNL 52 FEL | | Log Types: | CBL, DUAL IND/COMP.DENSITY/COMP.NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 849 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 849 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8534 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6866 ft., Bottom: 8534 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4639 ft. | | N | N | | SHANNON | 5242 ft. | | N | N | | NIOBRARA | 7570 ft. | | N | N | | CODELL | 7952 ft. | | N | N | | J SAND | 8368 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 5/1/2020 Interval Top: 8380 ft. Interval Bottom: 8398 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/24/2008 | | Treatment Summary: | JSND COMPLETION. FRAC'D THE JSND WITH 156,996 GAL 20# VISTAR HYBRID CROSS LINKED CONTAINING 254,080# SAND. 08/24/08. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8380 ft. | # Of Holes: | 36 | | Interval Bottom: | 8398 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/1/2008 Interval Top: 7738 ft. Interval Bottom: 8398 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/13/2008 | | Treatment Summary: | JSND-NB-CD COMMINGLE, DRILLED UP CFP @ 7850' AND 8080' TO COMMINGLE THE JSND-NB-CD 07/28/08. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8368 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/1/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 202 | | BBLS_OIL | 71 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 202 | | CALC_BBLS_OIL | 71 | | CALC_GOR | 3239 | | CALC_MCF_GAS | 230 | | CASING_PRESS | 1670 | | GRAVITY_OIL | 49 | | MCF_GAS | 230 | | TUBING_PRESS | 490 |
| | Perforation Data: | | Interval Top: | 7738 ft. | # Of Holes: | 132 | | Interval Bottom: | 8398 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 5/1/2020 Interval Top: 7738 ft. Interval Bottom: 7971 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/13/2008 | | Treatment Summary: | NB-CD RECOMPLETION. SET CFP 8080', FRAC'D CD WITH 109,956 GAL 24# TO 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 253,080# SAND. 06/24/08. SET CFP @ 7850', FRAC'D NB WITH 142,170 GAL 18# VISTAR CROSS LINKED GEL HYBRID CONTAINING 253,100# SAND 06/24/08 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7738 ft. | # Of Holes: | 96 | | Interval Bottom: | 7971 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 459 |
| Total Gas Produced (MCF) | 361 |
| GOR | 786 |
| GOR Determination | BOE |
| Average BOE per Day | 1.329 |
| Average MCFE per Day | 7.723 |
| Federal Financial Assurance | i | |
|
|