|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 10/1/2021 Measured TD: 8108 ft. Vertical TD: 8068 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 10/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20091697 | Expiration Date: | 5/14/2010 | | Proposed Top PZ Location: | Sec:23 Twp: 1N 69W | Footage: 1966 FSL 672 FWL | | Bottom Hole Location: | Sec:23 Twp: 1N 69W | Footage: 1966 FSL 672 FWL | | Proposed Depth/Form: | 8510 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SW4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SW4 |
| | |
| Wellbore Completed | | Completion Date: | 9/13/2009 | | Spud Date: | 9/9/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8108 ft. | Measured PB depth: | 8087 ft. | | True Vertical TD: | 8068 ft. | True Vertical PB depth: | 8047 ft. | | Top PZ Location: | Sec:23 Twp: 1N 69W | Footage: 1966 FSL 672 FWL | | Bottom Hole Location: | Sec:23 Twp: 1N 69W | Footage: 1966 FSL 672 FWL | | Log Types: | CBL/GR/CCL, PNN/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 758 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 242, Top: 0 ft., Bottom: 758 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8087 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 83, Top: 4920 ft., Bottom: 8087 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7500 ft. | | N | N | | FORT HAYS | 7898 ft. | | N | N | | CODELL | 7918 ft. | | N | N | | GREENHORN | 8004 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 1/20/2010 Interval Top: 7918 ft. Interval Bottom: 7936 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/12/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/5/2009 | | Treatment Summary: | FRAC'D CODL W/ 137,592 GALS SLICKWATER, SILVERSTIM, & 15% HCI W/ 269,000# OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7918 ft. | # Of Holes: | 72 | | Interval Bottom: | 7936 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 10/1/2021 Interval Top: 7508 ft. Interval Bottom: 7936 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/12/2010 | Choke Size: | 0.219 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/5/2009 | | Treatment Summary: | COMMINGLE NBRR & CODL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/20/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 114 | | BBLS_OIL | 128 | | BTU_GAS | 1320 | | CALC_BBLS_H2O | 114 | | CALC_BBLS_OIL | 128 | | CALC_GOR | 4281 | | CALC_MCF_GAS | 548 | | CASING_PRESS | 825 | | GRAVITY_OIL | 59 | | MCF_GAS | 548 |
| | Perforation Data: | | Interval Top: | 7508 ft. | # Of Holes: | 120 | | Interval Bottom: | 7936 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 1/20/2010 Interval Top: 7508 ft. Interval Bottom: 7700 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/12/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/5/2009 | | Treatment Summary: | FRAC'D NBRR W/ 181,020 GALS SLICKWATER, SILVERSTIM, & 15% HCI W/ 251,000# OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7508 ft. | # Of Holes: | 48 | | Interval Bottom: | 7700 ft. | Hole Size: | 0.72 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2027 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 09/30/2021 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|