|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/1/2023 Measured TD: 8385 ft. Vertical TD: 8168 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/1/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20072474 | Expiration Date: | 6/27/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1912 FNL 2015 FEL | | Bottom Hole Location: | Sec:11 Twp: 2N 69W | Footage: 1912 FNL 2015 FEL | | Proposed Depth/Form: | 8334 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NE4 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5097 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 210, Top: 4235 ft., Bottom: 5097 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/21/2007 | | Spud Date: | 8/13/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8385 ft. | Measured PB depth: | 8318 ft. | | True Vertical TD: | 8168 ft. | True Vertical PB depth: | 8101 ft. | | Top PZ Location: | Sec:26 Twp: 2N 69W | Footage: 1932 FNL 2037 FEL | | Bottom Hole Location: | Sec:26 Twp: 2N 69W | Footage: 1932 FNL 2037 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 738 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 738 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8374 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6742 ft., Bottom: 8374 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7490 ft. | | N | N | | CODELL | 7788 ft. | | N | N | | J SAND | 8226 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 4/1/2023 Interval Top: 8226 ft. Interval Bottom: 8246 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/6/2007 | | Treatment Summary: | JSND COMPLETION. FRAC'D THE JSND WITH 172,662 GAL FRAC FLUID AND 250,280# SAND. 09/06/07. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8226 ft. | # Of Holes: | 32 | | Interval Bottom: | 8246 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/3/2007 Interval Top: 7566 ft. Interval Bottom: 8246 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/21/2007 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CP @ 7700'. 09/27/07. DRILLED OUT CFP @ 7910' TO COMMINGLE THE JSND-NBRR-CDL. 09/28/07. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8207 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/3/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 92 | | BBLS_OIL | 43 | | BTU_GAS | 1288 | | CALC_BBLS_H2O | 92 | | CALC_BBLS_OIL | 43 | | CALC_GOR | 9209 | | CALC_MCF_GAS | 396 | | CASING_PRESS | 1260 | | GRAVITY_OIL | 45 | | MCF_GAS | 396 | | TUBING_PRESS | 683 |
| | Perforation Data: | | Interval Top: | 7566 ft. | # Of Holes: | 140 | | Interval Bottom: | 8246 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 4/1/2023 Interval Top: 7566 ft. Interval Bottom: 7808 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/6/2007 | | Treatment Summary: | NBRR-CDL RECOMPLETION. SET CFP @ 7910'. 09/06/07. FRAC'D THE CODELL WITH 111,412 GAL FRAC FLUID AND 250,080# 20/40 SAND. 09/06/07. SET CFP @ 7700'. 07/06/07. FRAC'D THE NIOBRARA WITH 174,973 GAL FRAC FLUID AND 251,680# 20/40 SAND. 09/06/07. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7566 ft. | # Of Holes: | 108 | | Interval Bottom: | 7808 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 377 |
| Total Gas Produced (MCF) | 5401 |
| GOR | 14326 |
| GOR Determination | BOE |
| Average BOE per Day | 3.583 |
| Average MCFE per Day | 20.768 |
| Federal Financial Assurance | i | |
|
|