|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/1/2026 Measured TD: 8545 ft. Vertical TD: 8320 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/1/2026 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20072375 | Expiration Date: | 6/11/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 50 FSL 50 FEL | | Bottom Hole Location: | Sec:1 Twp: 1N 69W | Footage: 50 FSL 50 FEL | | Proposed Depth/Form: | 8467 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 8/30/2007 | | Spud Date: | 8/22/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8545 ft. | Measured PB depth: | 8500 ft. | | True Vertical TD: | 8320 ft. | True Vertical PB depth: | 8275 ft. | | Top PZ Location: | Sec:1 Twp: 1N 69W | Footage: 14 FSL 21 FEL | | Bottom Hole Location: | Sec:1 Twp: 1N 69W | Footage: 14 FSL 21 FEL | | Log Types: | CBL, DUAL IND/COMP DENS/COMP NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.555555 in., Top: 0 ft., Depth: 775 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 775 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8535 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 6954 ft., Bottom: 8535 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5402 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 4230 ft., Bottom: 5410 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4456 ft. | | N | N | | NIOBRARA | 7567 ft. | | N | N | | CODELL | 7926 ft. | | N | N | | J SAND | 8352 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 2/1/2026 Interval Top: 8368 ft. Interval Bottom: 8386 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/10/2007 | | Treatment Summary: | JSND COMPLETION. FRAC'D THE JSAND WITH 173,586 GAL FRAC FLUID AND 251,120# SAND. 09/10/07. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8368 ft. | # Of Holes: | 36 | | Interval Bottom: | 8386 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/4/2007 Interval Top: 7682 ft. Interval Bottom: 8386 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 10/2/2007 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/30/2007 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED UP CFP@7810'. 09/28/07. DRIPPED UP CFP @8010' TO COMMINGLE THE JSND-NBRR-CDL. 09/30/2007. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8350 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/4/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 83 | | BBLS_OIL | 41 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 83 | | CALC_BBLS_OIL | 41 | | CALC_GOR | 5341 | | CALC_MCF_GAS | 219 | | CASING_PRESS | 1236 | | GRAVITY_OIL | 48 | | MCF_GAS | 219 | | TUBING_PRESS | 414 |
| | Perforation Data: | | Interval Top: | 7682 ft. | # Of Holes: | 144 | | Interval Bottom: | 8386 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 2/1/2026 Interval Top: 7682 ft. Interval Bottom: 7944 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/10/2007 | | Treatment Summary: | NBRR-CDL RECOMPLETION. SET CFP@8010'. 09/10/07. FRAC'D THE CODELL WITH 111,760 GAL FRAC FLUID AND 250,940# 20/40 SAND. 09/10/07. SET CFP@7810'. 09/10/07. FRAC'D THE NIOBRARA WITH 173, 293 GAL FRAC FLUID AND 251,620# 20/40 SAND. 09/10/07. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7682 ft. | # Of Holes: | 108 | | Interval Bottom: | 7944 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 43 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.019 |
| Average MCFE per Day | 0.119 |
| Federal Financial Assurance | i | |
|
|