Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06547
Well Classification: GW Status: PR - 2/1/2026
Well Name/No:WHEELER #33-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2026
FacilityID:290801LocationID:321480
County:BOULDER #013Location:NWSE 1 1N69W 6
Field:WATTENBERG - #90750Elevation:4968 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1969FSL  2010 FELLat/Long: 40.078470 / -105.062620Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.078470 / -105.062628Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/9/2010
End Date: 12/9/2010
Reported: 2/7/2012
Prior to rule 205A.b.(2)(A)
Days to report: 425
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/1/2026             Measured TD: 8050 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/1/2026
Wellbore Permit
Permit #: Expiration Date:11/29/2011
Proposed Depth/Form:8238 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: E2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 850 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 370, Top: 0 ft., Bottom: 850 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8238 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 290, Top: 7123 ft., Bottom: 8238 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5123 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 240, Top: 4133 ft., Bottom: 5123 ft.

Wellbore Completed
Completion Date:11/14/2010
Spud Date:11/5/2010Spud Date Is:ACTUAL
Measured TD:8050 ft.Measured PB depth:8026 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1 FL  2 FL
Bottom Hole Location:Sec: Twp: Footage: 1 FL  2 FL
Log Types:CBL, GAMMA RAY, C.C.L. DIL, DEN/NEU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 893 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 331, Top: 0 ft., Bottom: 893 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8039 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 695, Top: 3820 ft., Bottom: 8039 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4418 ft.
NIOBRARA7336 ft.
CODELL7704 ft.

Formation JSND                     Formation Classification:  GW                     Status:  PR - 2/1/2026                  Interval Top: 8068 ft.    Interval Bottom: 8098 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/9/2010
Treatment Summary:J SAND COMPLETION. FRAC'D THE J-SAND WITH 155,988 GAL 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 29,913 # 20/40 SAND. 12/09/2010.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8068 ft.# Of Holes:0
Interval Bottom:8098 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/14/2011                 Interval Top: 7450 ft.    Interval Bottom: 8098 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/23/2010
Treatment Summary:JSND-NBRR-COMMINGLE. DRILLED OUT CBP @ 7630'. 03/08/2011. DRILLED OUT CFP @ 7660 AND 7900' TO COMMINGLE THE JSND-CDL-NBRR. 03/08/2011.
Tubing Size:2.375 in.Tubing Setting Depth:8015 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/14/2011Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 29
BBLS_OIL 30
BTU_GAS 1208
CALC_BBLS_H2O 29
CALC_BBLS_OIL 30
CALC_GOR 44067
CALC_MCF_GAS 322
CASING_PRESS 1020
GRAVITY_OIL 54
MCF_GAS 322
TUBING_PRESS 500
Perforation Data:
Interval Top:7450 ft.# Of Holes:364
Interval Bottom:8098 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 2/1/2026                  Interval Top: 7450 ft.    Interval Bottom: 7770 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/23/2010
Treatment Summary:CDL-NBRR COMPLETION. SET CFP @ 7820'. 12/09/2010 SET CBP @ 5000'. 12/13/2010. DRILLED OUT CBP @ 5000'. 12/15/2010. DRILLED OUT CFP @ 7820'. 12/15/2010. SET CFP @ 7900. 12/21/2010. FRAC'D THE CODELL WITH 92,988 GAL 22# TO 28# VISTAR HYBRID CROSS LINKED GEL CONTAINING 176,320 # 20/40 SAND. 12/23/10. SET CFP @ 7660'. 12/23/2010. SET CBP @ 7630'. 02/12/2011. FRAC'D THE NIOBRARA WITH 143,136 GALS 18# PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,760 # 20/40 SAND. 02/17/2011.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7450 ft.# Of Holes:364
Interval Bottom:7770 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)22
GOR
GOR DeterminationMCFE
Average BOE per Day0.011
Average MCFE per Day0.060

 Federal Financial Assurance  i 

 Tribal Well  i No