|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/1/2025 Measured TD: 8436 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/1/2025 | | Wellbore Permit | | | Permit #: | 20070329 | Expiration Date: | 2/26/2008 | | Proposed Depth/Form: | 8407 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: NW/4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NW/4 |
| | |
| Wellbore Completed | | Completion Date: | 9/29/2007 | | Spud Date: | 9/21/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8436 ft. | Measured PB depth: | 8385 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, DUAL IND/COMP DENS/COMP NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 816 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 816 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8422 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6586 ft., Bottom: 8422 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5392 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 4600 ft., Bottom: 5392 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4642 ft. | | N | N | | SHANNON | 5092 ft. | | N | N | | NIOBRARA | 7424 ft. | | N | N | | CODELL | 7846 ft. | | N | N | | J SAND | 8236 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 9/1/2025 Interval Top: 8248 ft. Interval Bottom: 8264 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/10/2007 | | Treatment Summary: | JSND COMPLETION. FRAC'D THE JSND W/160,616 GALS FRAC FLUID & 251,000# SAND. 10/10/07. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8248 ft. | # Of Holes: | 32 | | Interval Bottom: | 8264 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 11/13/2007 Interval Top: 7426 ft. Interval Bottom: 8264 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/29/2007 | | Treatment Summary: | JSND/NBRR/CODL COMMINGLE. SET CBP @6800'. DRLD UP CBP @ 6800' 11/6/07. DRLD UP CFP @ 7700' & 7950' TO COMMINGLE JSND/NBRR/CODL 11/7/07. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8233 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/13/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 268 | | BBLS_OIL | 63 | | BTU_GAS | 1325 | | CALC_BBLS_H2O | 268 | | CALC_BBLS_OIL | 63 | | CALC_GOR | 6159 | | CALC_MCF_GAS | 388 | | CASING_PRESS | 1504 | | GRAVITY_OIL | 48 | | MCF_GAS | 388 | | TUBING_PRESS | 833 |
| | Perforation Data: | | Interval Top: | 7426 ft. | # Of Holes: | 176 | | Interval Bottom: | 8264 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 9/1/2025 Interval Top: 7426 ft. Interval Bottom: 7866 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/10/2007 | | Treatment Summary: | NBRR/CODL RECOMPLETION. SET CFP @ 7950'. FRAC'D CODL W/ 113,732 GALS FRAC FLUID & 250,040# 20/40 SAND. SET CFP @ 7700'. FRAC'D NBRR W/ 170,038 GALS FRAC FLUID & 250,040# SAND. 10/10/07. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7426 ft. | # Of Holes: | 144 | | Interval Bottom: | 7866 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 462 |
| Total Gas Produced (MCF) | 7785 |
| GOR | 16850 |
| GOR Determination | MCFE |
| Average BOE per Day | 4.963 |
| Average MCFE per Day | 28.757 |
| Federal Financial Assurance | i | |
|
|