Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06537
Well Classification: GW Status: PR - 7/1/2023
Well Name/No:WHEELER #31-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2023
FacilityID:289155LocationID:336373
County:BOULDER #013Location:SWNE 1 1N69W 6
Field:WATTENBERG - #90750Elevation:4965 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1940FNL  2205 FELLat/Long: 40.082170 / -105.063310Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.082170 / -105.063310Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2023             Measured TD: 8295 ft.    Vertical TD: 8099 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2023
Wellbore PermitDIRECTIONAL
Permit #:20066405 Expiration Date:1/29/2008
Proposed Top PZ Location:Sec: Twp: Footage: 660 FNL  2023 FEL
Bottom Hole Location:Sec:1 Twp: 1N 69W Footage: 660 FNL  2023 FEL
Proposed Depth/Form:8303 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5200 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 230, Top: 4130 ft., Bottom: 5200 ft.

Wellbore Completed
Completion Date:3/12/2007
Spud Date:3/4/2007Spud Date Is:ACTUAL
Measured TD:8295 ft.Measured PB depth:8230 ft.
True Vertical TD:8099 ft.True Vertical PB depth:8034 ft.
Top PZ Location:Sec:1 Twp: 1N 69WFootage: 654 FNL  2017 FEL
Bottom Hole Location:Sec:1 Twp: 1N 69WFootage: 654 FNL  2017 FEL
Log Types:CBL, CDL/CNL/DIL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 860 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 475, Top: 0 ft., Bottom: 860 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8253 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 7162 ft., Bottom: 8253 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5478 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 335, Top: 3916 ft., Bottom: 5478 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4442 ft.NN
SHANNON4994 ft.NN
NIOBRARA7384 ft.NN
CODELL7738 ft.NN
J SAND8169 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  PR - 7/1/2023                  Interval Top: 8182 ft.    Interval Bottom: 8200 ft.

 Completed Information for Formation J SAND
1st Production Date:3/24/2007Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/15/2007
Treatment Summary:J SAND COMPLETION FRAC'D THE JSND WITH 140,079 GAL OF FRAC FLUID AND 133,820# SAND 3/15/07
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8182 ft.# Of Holes:36
Interval Bottom:8200 ft.Hole Size:0.41 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/25/2007                 Interval Top: 7506 ft.    Interval Bottom: 8200 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:3/24/2007Choke Size:1.000 in.
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/12/2007
Treatment Summary:JNBCD COMMINGLE DRILLED OUT CFP@7610' AND 7840' TO COMMINGLE THE JSND-NBRR-CODL 05/02/07
Tubing Size:2.375 in.Tubing Setting Depth:8164 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/25/2007Test Method:
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 61
BBLS_OIL 124
BTU_GAS 1177
CALC_BBLS_H2O 61
CALC_BBLS_OIL 124
CALC_GOR 2379
CALC_MCF_GAS 295
CASING_PRESS 1050
MCF_GAS 295
TUBING_PRESS 650
Perforation Data:
Interval Top:7506 ft.# Of Holes:132
Interval Bottom:8200 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 7/1/2023                  Interval Top: 7506 ft.    Interval Bottom: 7756 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/15/2007
Treatment Summary:SET CFP@7840'.03/16/07. FRAC'D THE CODL WITH 109,749 GAL FRAC AND 244,111# 30/50 SAND 3/15/07, SET CFP@7610'. 03/16/07, FRA'D THE NBRR WITH 175,980 GAL FRAC FLUID AND 265,980# 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7506 ft.# Of Holes:96
Interval Bottom:7756 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)245
Total Gas Produced (MCF)6559
GOR26771
GOR DeterminationMCFE
Average BOE per Day3.777
Average MCFE per Day21.887

 Federal Financial Assurance  i 

 Tribal Well  i No