|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2021 Measured TD: 8540 ft. Vertical TD: 8344 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2021 | Wellbore Permit | DIRECTIONAL | Permit #: | 20075112 | Expiration Date: | 9/27/2008 | Proposed Top PZ Location: | Sec:12 Twp: 1N 69W | Footage: 2006 FSL 1979 FWL | Bottom Hole Location: | Sec:12 Twp: 1N 69W | Footage: 2006 FSL 1979 FWL | Proposed Depth/Form: | 8532 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: SW4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: SW4 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SW4 | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5400 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 300, Top: 4200 ft., Bottom: 5400 ft. |
| | |
Wellbore Completed | Completion Date: | 4/8/2008 | Spud Date: | 3/31/2008 | Spud Date Is: | ACTUAL | Measured TD: | 8540 ft. | Measured PB depth: | 8485 ft. | True Vertical TD: | 8344 ft. | True Vertical PB depth: | 8289 ft. | Top PZ Location: | Sec:12 Twp: 1N 69W | Footage: 2006 FSL 1979 FWL | Bottom Hole Location: | Sec:12 Twp: 1N 69W | Footage: 2006 S 1979 W | Log Types: | CBL, DUAL IND/COMP DENSITY/COMP NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 905 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 455, Top: 0 ft., Bottom: 905 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8528 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 6967 ft., Bottom: 8528 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5586 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 330, Top: 4324 ft., Bottom: 6084 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4570 ft. | | N | N | SHANNON | 5174 ft. | | N | N | NIOBRARA | 7570 ft. | | N | N | CODELL | 7937 ft. | | N | N | J SAND | 8370 ft. | | N | N |
Formation JSND Formation Classification: OW Status: PR - 5/1/2021 Interval Top: 8382 ft. Interval Bottom: 8400 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/4/2008 | Treatment Summary: | FRAC'D W/170,352 GAL FRAC FLUID; 253,460# SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8382 ft. | # Of Holes: | 36 | Interval Bottom: | 8400 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 5/27/2008 Interval Top: 7700 ft. Interval Bottom: 8400 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/8/2008 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8357 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/27/2008 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 50 | BBLS_OIL | 45 | BTU_GAS | 1000 | CALC_BBLS_H2O | 50 | CALC_BBLS_OIL | 45 | CALC_GOR | 4800 | CALC_MCF_GAS | 216 | CASING_PRESS | 1344 | GRAVITY_OIL | 50 | MCF_GAS | 216 | TUBING_PRESS | 429 |
| Perforation Data: | Interval Top: | 7700 ft. | # Of Holes: | 140 | Interval Bottom: | 8400 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: PR - 5/1/2021 Interval Top: 7700 ft. Interval Bottom: 7956 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/8/2008 | Treatment Summary: | FRAC'D CODELL W/116,634 GAL FRAC FLUID; 253,140# 20/40 SAND; FRAC'D NIOBRARA W/162,582 GAL FRAC FLUID; 255,020# 20/40 SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7700 ft. | # Of Holes: | 104 | Interval Bottom: | 7956 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 244 |
Total Gas Produced (MCF) | 4347 |
GOR | 17815 |
GOR Determination | MCFE |
Average BOE per Day | 2.714 |
Average MCFE per Day | 15.738 |
Federal Financial Assurance | i | |
|
|