Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06536
Well Classification: OW Status: PR - 5/1/2021
Well Name/No:ALLAN H UNIT #23-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2021
FacilityID:286686LocationID:336360
Municipality/County:ERIE / BOULDER #013Location:SESW 12 1N69W 6
Field:WATTENBERG - #90750Elevation:5009 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:553FSL  2181 FWLLat/Long: 40.060070 / -105.066660Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.060064 / -105.066656Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2021             Measured TD: 8540 ft.    Vertical TD: 8344 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2021
Wellbore PermitDIRECTIONAL
Permit #:20075112 Expiration Date:9/27/2008
Proposed Top PZ Location:Sec:12 Twp: 1N 69W Footage: 2006 FSL  1979 FWL
Bottom Hole Location:Sec:12 Twp: 1N 69W Footage: 2006 FSL  1979 FWL
Proposed Depth/Form:8532 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: SW4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: SW4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SW4
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5400 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 300, Top: 4200 ft., Bottom: 5400 ft.

Wellbore Completed
Completion Date:4/8/2008
Spud Date:3/31/2008Spud Date Is:ACTUAL
Measured TD:8540 ft.Measured PB depth:8485 ft.
True Vertical TD:8344 ft.True Vertical PB depth:8289 ft.
Top PZ Location:Sec:12 Twp: 1N 69WFootage: 2006 FSL  1979 FWL
Bottom Hole Location:Sec:12 Twp: 1N 69WFootage: 2006 FSL  1979 FWL
Log Types:CBL, DUAL IND/COMP DENSITY/COMP NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 905 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 455, Top: 0 ft., Bottom: 905 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8528 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6967 ft., Bottom: 8528 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5586 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 4324 ft., Bottom: 6084 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4570 ft.NN
SHANNON5174 ft.NN
NIOBRARA7570 ft.NN
CODELL7937 ft.NN
J SAND8370 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  PR - 5/1/2021                  Interval Top: 8382 ft.    Interval Bottom: 8400 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/4/2008
Treatment Summary:FRAC'D W/170,352 GAL FRAC FLUID; 253,460# SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8382 ft.# Of Holes:36
Interval Bottom:8400 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 5/27/2008                 Interval Top: 7700 ft.    Interval Bottom: 8400 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/8/2008
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:8357 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/27/2008Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 50
BBLS_OIL 45
BTU_GAS 1000
CALC_BBLS_H2O 50
CALC_BBLS_OIL 45
CALC_GOR 4800
CALC_MCF_GAS 216
CASING_PRESS 1344
GRAVITY_OIL 50
MCF_GAS 216
TUBING_PRESS 429
Perforation Data:
Interval Top:7700 ft.# Of Holes:140
Interval Bottom:8400 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  PR - 5/1/2021                  Interval Top: 7700 ft.    Interval Bottom: 7956 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/8/2008
Treatment Summary:FRAC'D CODELL W/116,634 GAL FRAC FLUID; 253,140# 20/40 SAND; FRAC'D NIOBRARA W/162,582 GAL FRAC FLUID; 255,020# 20/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7700 ft.# Of Holes:104
Interval Bottom:7956 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)284
Total Gas Produced (MCF)8325
GOR29313
GOR DeterminationMCFE
Average BOE per Day4.723
Average MCFE per Day27.397

 Federal Financial Assurance  i 

 Tribal Well  i No