Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06507
Well Classification: GW Status: PR - 7/1/2017
Well Name/No:WHEELER #32-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2017
FacilityID:271684LocationID:336373
County:BOULDER #013Location:SWNE 1 1N69W 6
Field:WATTENBERG - #90750Elevation:4963 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1970FNL  2206 FELLat/Long: 40.081977 / -105.063328Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.082086 / -105.063331Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2017             Measured TD: 8189 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2017
Wellbore PermitDRIFTED
Permit #:20040461 Expiration Date:3/24/2005
Proposed Depth/Form:8400 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: SNSD , Formation: SHANNON , Order: 316,320 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5200 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 300, Top: 4000 ft., Bottom: 5200 ft.

Wellbore Completed
Completion Date:4/3/2005
Spud Date:2/21/2005Spud Date Is:ACTUAL
Measured TD:8189 ft.Measured PB depth:8170 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, DUAL INDUCTION, COMPENSATED NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 904 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 388, Top: 0 ft., Bottom: 904 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8186 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6630 ft., Bottom: 8186 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5210 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 4030 ft., Bottom: 5210 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4274 ft.NN
SHANNON4840 ft.NN
NIOBRARA7259 ft.NN
FORT HAYS7572 ft.NN
CODELL7592 ft.NN
MOWRY8009 ft.NN
J SAND8023 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  PR - 7/1/2017                  Interval Top: 8040 ft.    Interval Bottom: 8060 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/2005
Treatment Summary:J SAND COMPLETION: FRAC'D THE J SAND (8040' - 8060') WITH 207,862 GAL FRAC FLUID WITH 300,700# SAND. 03/08/05
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8040 ft.# Of Holes:40
Interval Bottom:8060 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/9/2006                  Interval Top: 7593 ft.    Interval Bottom: 7613 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/2005
Treatment Summary:CODELL RECOMPLETION: SET CBP @ 7710'. 03/09/05 FRAC'D THE CODELL (7593' - 7613') WITH 111,426 GAL FRAC FLUID AND 196,629# SAND. 03/13/05
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7593 ft.# Of Holes:80
Interval Bottom:7613 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 4/6/2005                  Interval Top: 7593 ft.    Interval Bottom: 8060 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.281 in.
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/2005
Treatment Summary:J SAND-CODELL COMMINGLE: DRILLED OUT CBP @ 7710' TO COMMINGLE THE J SAND-CODELL. 04/03/05
Tubing Size:2.375 in.Tubing Setting Depth:8041 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/6/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 80
BBLS_OIL 52
CALC_BBLS_H2O 80
CALC_BBLS_OIL 52
CALC_GOR 9865
CALC_MCF_GAS 513
CASING_PRESS 900
MCF_GAS 513
TUBING_PRESS 620
Perforation Data:
Interval Top:7593 ft.# Of Holes:120
Interval Bottom:8060 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/9/2006                  Interval Top: 7262 ft.    Interval Bottom: 8060 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:3/7/2006Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/2005
Treatment Summary:JSND-NBRR-CDL COMMINGLE DRILLED OUT CBP @ 7485' TO COMMINGLE THE JSND-NBRR-CDL. 03-02-06
Tubing Size:2.375 in.Tubing Setting Depth:8030 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/9/2006Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 51
CALC_BBLS_H2O 11
CALC_BBLS_OIL 51
CALC_GOR 2569
CALC_MCF_GAS 131
CASING_PRESS 957
MCF_GAS 131
TUBING_PRESS 657
Perforation Data:
Interval Top:7262 ft.# Of Holes:280
Interval Bottom:8060 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 7/1/2017                  Interval Top: 7262 ft.    Interval Bottom: 7613 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/3/2005
Treatment Summary:NBRR-CDL RECOMPLETION FRAC'D THE CODELL (7593'-7613') WITH 111,426 GAL FRAC FLUID AND 196,629# SAND. 03-13-05 SET CBP @ 7485'. 11-24-05. FRAC'D THE NIOBRARA (7262'-7272', 7355'-7385') WITH 181,692 GAL FRAC FLUID AND 200,851# SAND. 11-29-05
Tubing Size:2.375 in.Tubing Setting Depth:7253 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/11/2006Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 7
CALC_BBLS_H2O 14
CALC_BBLS_OIL 7
CALC_GOR 7143
CALC_MCF_GAS 50
CASING_PRESS 718
MCF_GAS 50
TUBING_PRESS 709
Perforation Data:
Interval Top:7262 ft.# Of Holes:240
Interval Bottom:7613 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)558
Total Gas Produced (MCF)8474
GOR15186
GOR DeterminationMCFE
Average BOE per Day5.535
Average MCFE per Day32.103

 Federal Financial Assurance  i 

 Tribal Well  i No