|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2024 Measured TD: 8146 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2024 | | Wellbore Permit | | | Permit #: | 20030949 | Expiration Date: | 6/11/2004 | | Proposed Depth/Form: | 8300 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-1 , Unit Acreage: 160, Drill Unit: NW/4 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 160, Drill Unit: NW/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-50 , Unit Acreage: 160, Drill Unit: NW/4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-1 , Unit Acreage: 160, Drill Unit: NW/4 | | Formation And Spacing: | Code: SNSD , Formation: SHANNON , Order: , Unit Acreage: 160, Drill Unit: NW/4 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5100 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4000 ft., Bottom: 5100 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/11/2004 | | Spud Date: | 1/30/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 8146 ft. | Measured PB depth: | 8132 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, MICRO LOG, ARRAY IND., COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 718 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 718 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8140 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 6800 ft., Bottom: 8140 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5125 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 395, Top: 3526 ft., Bottom: 5129 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4221 ft. | | N | N | | NIOBRARA | 7288 ft. | | N | N | | FORT HAYS | 7567 ft. | | N | N | | CARLILE | 7588 ft. | | N | N | | CODELL | 7588 ft. | | N | N | | GREENHORN | 7650 ft. | | N | N | | BENTONITE | 7825 ft. | | N | N | | MOWRY | 7984 ft. | | N | N | | J SAND | 8001 ft. | | N | N | | SKULL CREEK | 8089 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 5/1/2024 Interval Top: 8010 ft. Interval Bottom: 8031 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/11/2004 | | Treatment Summary: | DRILL OUT CEMENT AND DV TOOL. PERF'S THE J SAND FROM 8010'-8012',8016'-8031' W/4 SPF. FRAC'D W/109,513 GAL SLF, 46,427 GAL SILVERSTIM AND 199,940# SAND.FLOW BACK WELL. RIH W/NC/SN,PRODUCTION TBG. LAND PRODUCTION TBG @ 7990'. BROACH TBG. SWAB. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7990 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/1/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 43 | | CALC_BBLS_H2O | 43 | | CALC_MCF_GAS | 256 | | CASING_PRESS | 400 | | MCF_GAS | 256 | | TUBING_PRESS | 150 |
| | Perforation Data: | | Interval Top: | 8010 ft. | # Of Holes: | 68 | | Interval Bottom: | 8031 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 4/19/2004 Interval Top: 7590 ft. Interval Bottom: 7604 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/11/2004 | | Treatment Summary: | SET CFP @ 7660', 4/7/04. FRAC'D CODELLW/ 132,700 GAL FRAC FLUID AND 300,140# SAND, 4/14/04 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/19/2004 | Test Method: | FLOWING | | Hours Tested: | 17 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 108 | | BBLS_OIL | 70 | | CALC_BBLS_H2O | 108 | | CALC_BBLS_OIL | 70 | | CALC_GOR | 2857 | | CALC_MCF_GAS | 200 | | MCF_GAS | 200 | | TUBING_PRESS | 440 |
| | Perforation Data: | | Interval Top: | 7590 ft. | # Of Holes: | 44 | | Interval Bottom: | 7604 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 5/5/2004 Interval Top: 7590 ft. Interval Bottom: 8031 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/11/2004 | | Treatment Summary: | REMOVED CFP @ 7660' TO COMMINGLE THE J SAND AND THE CODELL, 5/03/2004 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7992 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/5/2004 | Test Method: | FLOWING | | Hours Tested: | 15 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 66 | | CALC_BBLS_H2O | 20 | | CALC_BBLS_OIL | 66 | | CALC_GOR | 3424 | | CALC_MCF_GAS | 226 | | CASING_PRESS | 850 | | MCF_GAS | 226 | | TUBING_PRESS | 440 |
| | Perforation Data: | | Interval Top: | 7590 ft. | # Of Holes: | 112 | | Interval Bottom: | 8031 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 4/13/2006 Interval Top: 7360 ft. Interval Bottom: 8031 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 4/12/2006 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/11/2004 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE DRILLED OUT CBP@7500' TO COMMINGLE THE JSND-NBRR-CDL. 4/10/06 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7992 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/13/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 32 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 32 | | CALC_GOR | 7188 | | CALC_MCF_GAS | 230 | | CASING_PRESS | 799 | | MCF_GAS | 230 | | TUBING_PRESS | 372 |
| | Perforation Data: | | Interval Top: | 7360 ft. | # Of Holes: | 232 | | Interval Bottom: | 8031 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 5/1/2024 Interval Top: 7360 ft. Interval Bottom: 7604 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/5/2006 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/5/2006 | | Treatment Summary: | NBRR/CDL RECOMPLTN: FRACD CDLL(7590'-7598', 7601'-7604') W/132,700 GAL FRAC FLUID & 300,140# SAND.4/14/04 SET CBP@ 7500'. 3/27/06. FRACD NBRR(7360'-7390') W/166,572GAL FRAC FLUID & 250,800# SAND. 4/5/06. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7360 ft. | # Of Holes: | 164 | | Interval Bottom: | 7604 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 82 |
| Total Gas Produced (MCF) | 2196 |
| GOR | 26780 |
| GOR Determination | MCFE |
| Average BOE per Day | 1.261 |
| Average MCFE per Day | 7.303 |
| Federal Financial Assurance | i | |
|
|