|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 11/1/2025 Measured TD: 7816 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 11/1/2025 | | Wellbore Permit | | | Permit #: | 20043205 | Expiration Date: | 12/27/2005 | | Proposed Depth/Form: | 8200 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 320, Drill Unit: E2 | | Casing: | String Type: 1ST LINER, Hole Size: , Size: 2.375 in., Top: , Depth: , Weight: 4.7 , Citings Type: PLANNED | | Cement: | Sacks: 20, Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 11/3/1993 | | Spud Date: | 9/9/1993 | Spud Date Is: | ACTUAL | | Measured TD: | 7816 ft. | Measured PB depth: | 7756 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 499 ft., Weight: 24 , Citings Type: HISTORICAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 499 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: 0 ft., Depth: 7754 ft., Weight: 7.7 , Citings Type: HISTORICAL | | Cement: | Sacks: 366, Top: 6990 ft., Bottom: 7754 ft., Determination Method: cbl | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 192, Top: 4485 ft., Bottom: 5560 ft., Determination Method: cbl | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SHANNON | 4804 ft. | | | | | NIOBRARA | 7298 ft. | | | | | CODELL | 7631 ft. | | | |
Formation NB-CD Formation Classification: GW Status: SI - 11/1/2025| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/3/1993 | Choke Size: | 1,264.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | No Perforation Data was found for formation NB-CD. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 8 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.003 |
| Average MCFE per Day | 0.022 |
| Federal Financial Assurance | i | |
|
|