|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 11/1/2025 Measured TD: 8183 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 11/1/2025 | | Wellbore Permit | | | Permit #: | 20043204 | Expiration Date: | 12/27/2005 | | Proposed Depth/Form: | 8200 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 320, Drill Unit: E2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 452 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 249, Top: 0 ft., Bottom: 452 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: , Depth: 7741 ft., Weight: 7.7 , Citings Type: PLANNED | | Cement: | Sacks: 427, Top: 6670 ft., Bottom: 7741 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/25/2005 | | Spud Date: | 2/22/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 8183 ft. | Measured PB depth: | 8165 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL-LINER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 452 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 249, Top: 0 ft., Bottom: 452 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 1.5 in., Top: 0 ft., Depth: 7741 ft., Weight: 7.7 , Citings Type: ACTUAL | | Cement: | Sacks: 427, Top: 6670 ft., Bottom: 7741 ft., Determination Method: | | Casing: | String Type: 1ST LINER, Hole Size: 2.875 in., Size: 2.375 in., Top: 7635 ft., Depth: 8173 ft., Weight: 4.7 , Citings Type: ACTUAL | | Cement: | Sacks: 4, Top: 7654 ft., Bottom: 8173 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4742 ft. | | N | N | | NIOBRARA | 7200 ft. | | N | N | | CODELL | 7588 ft. | | N | N | | J SAND | 8022 ft. | | N | N |
Formation JSND Formation Classification: GW Status: SI - 4/1/2024 Interval Top: 8022 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/25/2005 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | No Perforation Data was found for formation JSND. |
|
Formation JNBCD Formation Classification: GW Status: CM - 4/5/2005 Interval Top: 7350 ft. Interval Bottom: 8062 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 4/5/2005 | Choke Size: | 0.375 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/13/1994 | | Treatment Summary: | PERF JSND 8028-8032',8038-8046',8060-8062' W/56 HOLES; FRAC J SAND W/138,054 GALS SILVERSTIM 24# GEL, 434,242# 20/40 SAND & 12,000# 16/30 SB EXCEL SAND, 3/17/05 |
| | Tubing Size: | 2.0625 in. | Tubing Setting Depth: | 7630 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/5/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 0 | | BTU_GAS | 1166 | | CALC_BBLS_H2O | 10 | | CALC_MCF_GAS | 64 | | CASING_PRESS | 450 | | MCF_GAS | 64 | | TUBING_PRESS | 100 |
| | Perforation Data: | | Interval Top: | 7350 ft. | # Of Holes: | 70 | | Interval Bottom: | 8062 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: SI - 11/1/2025| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/13/1994 | Choke Size: | 1,064.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | No Perforation Data was found for formation NB-CD. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 27 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.014 |
| Average MCFE per Day | 0.073 |
| Federal Financial Assurance | i | |
|
|