|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/7/2021 Measured TD: 8455 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/7/2021 | | Wellbore Permit | DRIFTED | | Permit #: | 19921375 | Expiration Date: | 10/16/1993 | | Proposed Depth/Form: | 8520 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: SW | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: SW |
| | |
| Wellbore Completed | | Completion Date: | 10/29/1992 | | Spud Date: | 10/17/1992 | Spud Date Is: | ACTUAL | | Measured TD: | 8455 ft. | Measured PB depth: | 8455 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | DIL, CNDL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 695 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 490, Top: 0 ft., Bottom: 695 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8455 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 322, Top: 6918 ft., Bottom: 8455 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7474 ft. | | | | | CODELL | 7909 ft. | | | | | J SAND | 8332 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 7/7/2021 Interval Top: 8332 ft. Interval Bottom: 8357 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/9/1992 | Choke Size: | 0.156 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/29/1992 | | Treatment Summary: | 22,400# 100 M & 514,000# 20/40 M |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/31/1992 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 16 | | CASING_PRESS | 570 | | MCF_GAS | 150 | | TUBING_PRESS | 360 |
| | Perforation Data: | | Interval Top: | 8332 ft. | # Of Holes: | 25 | | Interval Bottom: | 8357 ft. | Hole Size: | 0.5 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/1/2020 Interval Top: 7493 ft. Interval Bottom: 8357 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/15/1993 | Choke Size: | 0.188 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/22/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 17 | | CALC_GOR | 9411 | | CASING_PRESS | 700 | | MCF_GAS | 160 | | TUBING_PRESS | 500 |
| | Perforation Data: | | Interval Top: | 7493 ft. | # Of Holes: | 38 | | Interval Bottom: | 8357 ft. | Hole Size: | 0.5 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/7/2021 Interval Top: 7493 ft. Interval Bottom: 7921 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/27/1993 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/29/1992 | | Treatment Summary: | 500 GAL 7.5% HCL ACID, 103,270 GAL YF540HT & 300,000# SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/30/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 30 | | CALC_GOR | 5000 | | CASING_PRESS | 800 | | MCF_GAS | 150 | | TUBING_PRESS | 600 |
| | Perforation Data: | | Interval Top: | 7493 ft. | # Of Holes: | 13 | | Interval Bottom: | 7921 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/07/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|