Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06274
Well Classification: GW Status: SI - 12/1/2025
Well Name/No:MARY MILLER #4-35
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date12/1/2025
FacilityID:206779LocationID:321364
County:BOULDER #013Location:SENE 35 1N69W 6
Field:WATTENBERG - #90750Elevation:5173 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FNL  660 FELLat/Long: 40.009418 / -105.076828Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.009430 / -105.076850Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 12/1/2025             Measured TD: 8630 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 12/1/2025
Wellbore Permit
Permit #:20000317 Expiration Date:4/6/2001
Proposed Depth/Form:8700 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit: E/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE4

Wellbore Completed
Completion Date:9/16/1992
Spud Date:9/2/1992Spud Date Is:ACTUAL
Measured TD:8630 ft.Measured PB depth:8624 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR,CBL,CDL(NEW DRILL) CBL& GR (DEEPENING)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 718 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 718 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8214 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 6834 ft., Bottom: 8624 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 0 ft., Depth: 8624 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 26, Top: 7676 ft., Bottom: 8624 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7642 ft.NN
CODELL8082 ft.NN
J SAND8526 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  SI - 12/1/2025                 Interval Top: 8514 ft.    Interval Bottom: 8548 ft.

 Completed Information for Formation J SAND
1st Production Date:5/31/2000Choke Size:0.313 in.
Formation Name:J SANDCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/16/1992
Treatment Summary:177324 GAL & 426520# 20/40 ON 5/22/00
Tubing Size:1.5 in.Tubing Setting Depth:8481 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/23/2000Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 1
CALC_BBLS_H2O 10
CALC_BBLS_OIL 1
CALC_GOR 170000
CALC_MCF_GAS 170
CASING_PRESS 400
MCF_GAS 170
TUBING_PRESS 200
Perforation Data:
Interval Top:8514 ft.# Of Holes:68
Interval Bottom:8548 ft.Hole Size:0.24 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 12/1/2025                 Interval Top: 7670 ft.    Interval Bottom: 8095 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/18/1992Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/16/1992
Treatment Summary:139860 GAL IN 24500# 100 MESH & 407000# 20/40
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/18/1992Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 50
CALC_BBLS_H2O 20
CALC_BBLS_OIL 50
CALC_GOR 4400
CALC_MCF_GAS 220
CASING_PRESS 1160
MCF_GAS 220
Perforation Data:
Interval Top:7670 ft.# Of Holes:13
Interval Bottom:8095 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)34
GOR
GOR DeterminationMCFE
Average BOE per Day0.014
Average MCFE per Day0.093

 Federal Financial Assurance  i 

 Tribal Well  i No