Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06252
Well Classification: GW Status: PA - 10/10/2013
Well Name/No:YOUNG #3-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/10/2013
FacilityID:206757LocationID:321349
Municipality/County:ERIE / BOULDER #013Location:NWSE 25 1N69W 6
Field:WATTENBERG - #90750Elevation:5118 ft.
Planned Location:1650FSL  1650 FELLat/Long: 40.019307 / -105.061307Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.019330 / -105.061260Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 10/10/2013             Measured TD: 8525 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 10/10/2013
Wellbore Permit
Permit #:19910427 Expiration Date:5/30/1992
Proposed Depth/Form:8620 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: SE

Wellbore Completed
Completion Date:8/29/1991
Spud Date:7/22/1991Spud Date Is:ACTUAL
Measured TD:8525 ft.Measured PB depth:8524 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Log Types:DIL, CNDL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 786 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 786 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8524 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 458, Top: 6980 ft., Bottom: 8524 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4560 ft.
NIOBRARA7510 ft.
CODELL7978 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 10/10/2013                Interval Top: 8408 ft.    Interval Bottom: 8432 ft.

 Completed Information for Formation J SAND
1st Production Date:9/12/1991Choke Size:0.000 in.
Formation Name:J SANDCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:8/29/1991
Treatment Summary:24,000# 100 M, 522,000# 20/40 M
Tubing Size:2.375 in.Tubing Setting Depth:8363 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/20/1991Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 21
CASING_PRESS 1300
MCF_GAS 450
TUBING_PRESS 1240
Perforation Data:
Interval Top:8408 ft.# Of Holes:32
Interval Bottom:8432 ft.Hole Size:0.37 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 10/10/2013                Interval Top: 7450 ft.    Interval Bottom: 8432 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:8/18/1992Choke Size:0.156 in.
Formation Name:J-NIOBRARA-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:8363 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/1992Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 30
CALC_GOR 11867
CASING_PRESS 1100
GRAVITY_OIL 44
MCF_GAS 356
TUBING_PRESS 700
Perforation Data:
Interval Top:7450 ft.# Of Holes:45
Interval Bottom:8432 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/10/2013                Interval Top: 7450 ft.    Interval Bottom: 7993 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/11/1992Choke Size:0.156 in.
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:8/29/1991
Treatment Summary:25,600# 100 M, 448,300#
Tubing Size:2.375 in.Tubing Setting Depth:8363 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/22/1992Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 13
CALC_GOR 14154
CASING_PRESS 600
GRAVITY_OIL 48
MCF_GAS 184
Perforation Data:
Interval Top:7450 ft.# Of Holes:13
Interval Bottom:7993 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/10/2013
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No