|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/1/2026 Measured TD: 8431 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/1/2026 | | Wellbore Permit | | | Permit #: | 19841062 | Expiration Date: | 8/8/1985 | | Proposed Depth/Form: | 8500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-314 , Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 407-314 , Unit Acreage: 160, Drill Unit: NE4 |
| | |
| Wellbore Completed | | Completion Date: | 1/19/1993 | | Spud Date: | 8/11/1984 | Spud Date Is: | ACTUAL | | Measured TD: | 8431 ft. | Measured PB depth: | 0 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | DIL, CDL, NGT | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 718 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8425 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4664 ft. | | | | | SHANNON | 5148 ft. | | | | | NIOBRARA | 7420 ft. | | | | | TIMPAS | 7818 ft. | | | | | CODELL | 7838 ft. | | | | | GREENHORN | 7930 ft. | | | | | J SAND | 8282 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 2/1/2026 Interval Top: 8284 ft. Interval Bottom: 8298 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/25/1985 | Choke Size: | 0.000 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/19/1993 | | Treatment Summary: | 325,000# 20/40 M IN 99,500 GAL GEL |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | | | Tubing Packer Depth: | 7662 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/25/1985 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | CASING_PRESS | 465 | | MCF_GAS | 539 | | TUBING_PRESS | 245 |
| | Perforation Data: | | Interval Top: | 8284 ft. | # Of Holes: | 42 | | Interval Bottom: | 8298 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 7/1/2020 Interval Top: 7424 ft. Interval Bottom: 8298 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/29/1993 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8270 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/1/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 6 | | CALC_GOR | 7500 | | CASING_PRESS | 800 | | MCF_GAS | 45 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 7424 ft. | # Of Holes: | 1342 | | Interval Bottom: | 8298 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: PR - 2/1/2026 Interval Top: 7424 ft. Interval Bottom: 7857 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/19/1993 | | Treatment Summary: | CODL: 340,000# 20/40 M IN 94,000 GAL GEL. NBRR: 232,000# 20/40 M IN 189,000 GAL GEL |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7662 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7424 ft. | # Of Holes: | 1300 | | Interval Bottom: | 7857 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 2 |
| Total Gas Produced (MCF) | 66 |
| GOR | 33000 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.035 |
| Average MCFE per Day | 0.212 |
| Federal Financial Assurance | i | |
|
|