|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 12/1/2025 Measured TD: 8706 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 12/1/2025 | | Wellbore Permit | | | Permit #: | 19821610 | Expiration Date: | 10/5/1983 | | Proposed Depth/Form: | 8675 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | 9/11/1991 | | Spud Date: | 10/11/1982 | Spud Date Is: | ACTUAL | | Measured TD: | 8706 ft. | Measured PB depth: | 8683 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | CDL, DIL, PROLOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 687 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 475, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8706 ft., Weight: 10.5&11.6, Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4806 ft. | | | | | BENTONITE | 5074 ft. | | | | | SHANNON | 5394 ft. | | | | | CODELL | 8132 ft. | | | | | J SAND | 8565 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 12/1/2025 Interval Top: 8567 ft. Interval Bottom: 8582 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/19/1983 | Choke Size: | 0.000 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/11/1991 | | Treatment Summary: | 50,000# 100 M, 530,000$ 20/40 M, 3,866 BLW |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7735 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/30/1983 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 16 | | BBLS_OIL | 2 | | CASING_PRESS | 750 | | MCF_GAS | 440 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 8567 ft. | # Of Holes: | 30 | | Interval Bottom: | 8582 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/1/2020 Interval Top: 7900 ft. Interval Bottom: 8584 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 12/29/1991 | Choke Size: | 0.313 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8570 ft. | | Tubing Packer Depth: | 7735 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/31/1991 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | BBLS_OIL | 25 | | CALC_GOR | 11000 | | CASING_PRESS | 1250 | | MCF_GAS | 275 | | TUBING_PRESS | 550 |
| | Perforation Data: | | Interval Top: | 7900 ft. | # Of Holes: | 41 | | Interval Bottom: | 8584 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: SI - 12/1/2025 Interval Top: 7900 ft. Interval Bottom: 8148 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/19/1983 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/11/1991 | | Treatment Summary: | ACIDIZE - DROP 20. 7/8 IN., 1/3 SP. GR. BALLS. BALL WELL OFF TO 6,000#. FRAC W/ 24,000# 100 M, 417,000# 20/40 M. 18 BPM@ 6,500# |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8570 ft. | | Tubing Packer Depth: | 7735 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/16/1991 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 37 | | MCF_GAS | 135 |
| | Perforation Data: | | Interval Top: | 7900 ft. | # Of Holes: | 11 | | Interval Bottom: | 8148 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 34 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.014 |
| Average MCFE per Day | 0.093 |
| Federal Financial Assurance | i | |
|
|