|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/1/2023 Measured TD: 8198 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/1/2023 | Wellbore Permit | DRIFTED | Permit #: | 820207 | Expiration Date: | 10/18/1994 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 160, Drill Unit: NW4 |
| | |
Wellbore Completed | Completion Date: | 5/6/1982 | Spud Date: | 2/12/1982 | Spud Date Is: | ACTUAL | Measured TD: | 8198 ft. | Measured PB depth: | 8178 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 758 ft., Weight: , Citings Type: HISTORICAL | Cement: | Sacks: 700, Top: 0 ft., Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8208 ft., Weight: , Citings Type: HISTORICAL | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4882 ft. | | | | NIOBRARA | 7278 ft. | | | | FORT HAYS | 7618 ft. | | | | CODELL | 7666 ft. | | | | J SAND | 8048 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 4/1/2023 Interval Top: 8048 ft. Completed Information for Formation J SAND | 1st Production Date: | 5/6/1982 | Choke Size: | 0.000 in. | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| No Perforation Data was found for formation JSND. |
|
Formation NB-CD Formation Classification: GW Status: PR - 4/1/2023 Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| No Perforation Data was found for formation NB-CD. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 184 |
Total Gas Produced (MCF) | 3279 |
GOR | 17820 |
GOR Determination | MCFE |
Average BOE per Day | 2.062 |
Average MCFE per Day | 11.951 |
Federal Financial Assurance | i | |
|
|