|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 8/1/2024 Measured TD: 8257 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 8/1/2024 | Wellbore Permit | | Permit #: | 19801891 | Expiration Date: | 4/29/1981 | Prop Depth/Form: | 8525 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 342, Drill Unit: W2 |
| | |
Wellbore Completed | Completion Date: | 3/16/1984 | Spud Date: | 12/29/1981 | Spud Date Is: | ACTUAL | Measured TD: | 8257 ft. | Measured PB depth: | 8000 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Log Types: | CFD, I-SFL, ACB | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 584 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 584 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8300 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 325, Top: 6270 ft., Bottom: 8300 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7312 ft. | | | | FORT HAYS | 7762 ft. | | | | CODELL | 7781 ft. | | | |
Formation JSND Formation Classification: GW Status: TA - 9/1/2017 Interval Top: 8211 ft. Interval Bottom: 8226 ft. Completed Information for Formation J SAND | 1st Production Date: | 7/25/1981 | Choke Size: | 0.234 in. | Formation Name: | J SAND | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/16/1984 | Treatment Summary: | 48,500# 100 M, 352,000# 20/40 M |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | | Tubing Packer Depth: | 7606 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/6/1981 | Test Method: | FLOWING | Hours Tested: | 10 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 10 | BBLS_OIL | 20 | CALC_BBLS_H2O | 24 | CALC_BBLS_OIL | 48 | CALC_MCF_GAS | 740 | CASING_PRESS | 425 | MCF_GAS | 300 | TUBING_PRESS | 600 |
| Perforation Data: | Interval Top: | 8211 ft. | # Of Holes: | 43 | Interval Bottom: | 8226 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: CM - 5/7/1992 Interval Top: 7785 ft. Interval Bottom: 7800 ft. Completed Information for Formation CODELL | 1st Production Date: | 11/7/1984 | Choke Size: | | Formation Name: | CODELL | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/16/1984 | Treatment Summary: | ACIDIZE W/ 2,000 GAL 12-3, 20,000# 100 M, 165,000# 20/40 M |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | | Tubing Packer Depth: | 7606 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/7/1984 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 18 | MCF_GAS | 120 |
| Perforation Data: | Interval Top: | 7785 ft. | # Of Holes: | 32 | Interval Bottom: | 7800 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 2/15/1992 Interval Top: 7634 ft. Interval Bottom: 7850 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 1/29/1992 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/16/1984 | Treatment Summary: | 8100 SLICK FRESH H2O, 45-50 BPM @ 7,200#-7,500#, 5,500# OF DIVERT-5 WAX BEAD DIVERTER IN 6 STAGES |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | | Tubing Packer Depth: | 7606 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/15/1992 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 80 | BBLS_OIL | 11 | CALC_GOR | 2273 | MCF_GAS | 25 |
| Perforation Data: | Interval Top: | 7634 ft. | # Of Holes: | 24 | Interval Bottom: | 7850 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: SI - 11/1/2023 Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 1/29/1992 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/10/2011 | Treatment Summary: | OPERATOR IS REPORTING ALLOCATIONS BECAUSE OF INTEREST |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| No Perforation Data was found for formation NB-CD. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2027 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (TA ) | Y | Defined Inactive 02/04/2024 |
Low Producing | Y | Production Period 08/2023 - 07/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 6 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.003 |
Average MCFE per Day | 0.016 |
Federal Financial Assurance | i | |
|
|