Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-009-06503
Well Classification: OW Status: TA - 9/9/2024
Well Name/No:S.E. CAMPO UNIT #606
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:MURFIN DRILLING COMPANY INC - 61650
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:8100
Facility Status:TAStatus Date9/9/2024
FacilityID:206087LocationID:321120
County:BACA #009Location:SESW 1 35S46W 6
Field:CAMPO - #9850Elevation:4123 ft.
Basin:HUGOTON EMBAYMENT  
Planned Location:860FSL  1980 FWLLat/Long: 37.020515 / -102.554249Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 37.020605 / -102.554209Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 9/9/2024             Measured TD: 4250 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 9/9/2024
Wellbore Permit
Permit #:19920121 Expiration Date:5/26/1992
Proposed Depth/Form:4250 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:SE CAMPO Unit Number:606
Formation And Spacing:Code: LNSNG , Formation: LANSING , Order: 0 , Unit Acreage: 40, Drill Unit: SESW

Wellbore Completed
Completion Date:8/31/1992
Spud Date:4/13/1992Spud Date Is:ACTUAL
Measured TD:4250 ft.Measured PB depth:4195 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Log Types:DIL, COMPENSATED SONIC; SDDSN; MICROLOG
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 29 ft., Weight: UNK , Citings Type: ACTUAL
Cement:Sacks: 1, Top: 0 ft., Bottom: 29 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1780 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 0 ft., Bottom: 1780 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 4249 ft., Weight: 14 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 3100 ft., Bottom: 4249 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 3100 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 3100 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
WOLFCAMP2471 ft.
NEVA2851 ft.
TOPEKA3141 ft.
LANSING3911 ft.
DES MOINES4071 ft.

Formation LNSNG                   Formation Classification:  OW                   Status:  TA - 9/9/2024                  Interval Top: 3903 ft.    Interval Bottom: 3913 ft.

 Completed Information for Formation LANSING
1st Production Date:9/3/1992Choke Size: 
Formation Name:LANSINGCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/31/1992
Treatment Summary:1500 GALS 15% FE ACID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 37
MCF_GAS 200
Perforation Data:
Interval Top:3903 ft.# Of Holes:4
Interval Bottom:3913 ft.Hole Size:0.5 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY12/11/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveYNoticed Date
06/06/2023
Defined Inactive (TA)YLast Production
12/31/2018
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No