Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07520
Well Classification: OW Status: PR - 1/30/2024
Well Name/No:Prosper Farms 4-65 #2-1-6 1AH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/30/2024
FacilityID:483664LocationID:443722
County:ARAPAHOE #005Location:NWSW 2 4S65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5631 ft.
Planned Location:1530FSL  553 FWLLat/Long: 39.729810 / -104.638752Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/21/2023
End Date: 9/8/2023
Reported: 11/2/2023
Days to report: 55
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/30/2024             Measured TD: 24175 ft.    Vertical TD: 7664 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/30/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/15/2025
Proposed Top PZ Location:Sec:2 Twp: 4S 65W Footage: 600 FNL  330 FWL
Bottom Hole Location:Sec:6 Twp: 4S 64W Footage: 400 FNL  330 FEL
Proposed Depth/Form:24225 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-1398 , Unit Acreage: 1920, Drill Unit: T4S R64W Sec. 6: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 114, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3425 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1142, Top: 0 ft., Bottom: 3425 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 24225 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 3742, Top: , Bottom: 24225 ft.

Wellbore Completed
Completion Date:3/7/2023
Spud Date:1/25/2023Spud Date Is:ACTUAL
Measured TD:24175 ft.Measured PB depth:24155 ft.
True Vertical TD:7664 ft.True Vertical PB depth:7664 ft.
Top PZ Location:Sec:2 Twp: 4S 65WFootage: 641 FNL  354 FWL
Bottom Hole Location:Sec:6 Twp: 4S 64WFootage: 437 N  333 E
Log Types:CBL, MWD/LWD, (Resistivity on 005-07515 & 005-07519).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 37 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3764 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1478, Top: 0 ft., Bottom: 3764 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 24155 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3875, Top: 365 ft., Bottom: 24155 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5275 ft.NN
SUSSEX5702 ft.NN
SHANNON6555 ft.NN
SHARON SPRINGS8326 ft.NN
NIOBRARA8378 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/30/2024                 Interval Top: 8736 ft.    Interval Bottom: 24096 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/20/2024Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:8/21/2023Treatment End Date:9/8/2023
Treatment Summary:Frac'd Niobrara with 91 stage plug and perf: 17778403 total pounds proppant pumped: 5632855 pounds 40/70 mesh; 12145548 pounds 100 mesh; 772839 total bbls fluid pumped: 714856 bbls gelled fluid; 51452 bbls fresh water and 6531 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):772839Max pressure during treatment (psi):9004
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:91
Total acid used in treatment (bbls):6531Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):51452Disposition method For flowback:DISPOSAL
Total proppant used (lbs):17778403Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8448 ft.
Tubing Packer Depth:8446 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/30/2024Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1180
BBLS_OIL 552
BTU_GAS 1400
CALC_BBLS_H2O 1180
CALC_BBLS_OIL 552
CALC_GOR 1033
CALC_MCF_GAS 570
CASING_PRESS 1022
GRAVITY_OIL 40
MCF_GAS 570
TUBING_PRESS 1362
Perforation Data:
Interval Top:8736 ft.# Of Holes:3509
Interval Bottom:24096 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)204592
Total Gas Produced (MCF)327404
GOR1600
GOR DeterminationBOE
Average BOE per Day715.682
Average MCFE per Day4150.959

 Federal Financial Assurance  i 

 Tribal Well  i No