Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07485
Well Classification: OW Status: PR - 4/1/2024
Well Name/No:Sunset 4-65 21-22 #4BH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2024
FacilityID:256212LocationID:450063
Municipality/County:AURORA / ARAPAHOE #005Location:NWSW 21 4S65W 6
Field:WILDCAT - #99999Elevation:5619 ft.
Planned Location:1382FSL  431 FWLLat/Long: 39.685835 / -104.676910Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/17/2021
End Date: 1/2/2022
Reported: 7/8/2022
Originally Reported: 2/15/2022
Days to report: 187
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2024             Measured TD: 18129 ft.    Vertical TD: 7837 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/13/2023
Proposed Top PZ Location:Sec:21 Twp: 4S 65W Footage: 495 FSL  468 FWL
Bottom Hole Location:Sec:22 Twp: 4S 65W Footage: 497 FSL  465 FEL
Proposed Depth/Form:18115 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-1342 , Unit Acreage: 1280, Drill Unit: Sec. 21 & 22: All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 99 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 86, Top: 0 ft., Bottom: 99 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2250 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 1212, Top: 0 ft., Bottom: 2250 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18115 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2638, Top: , Bottom: 18115 ft.

Wellbore Completed
Completion Date:10/6/2020
Spud Date:9/10/2021Spud Date Is:ACTUAL
Measured TD:18129 ft.Measured PB depth:18117 ft.
True Vertical TD:7837 ft.True Vertical PB depth:7837 ft.
Top PZ Location:Sec:21 Twp: 4S 65WFootage: 495 FSL  468 FWL
Bottom Hole Location:Sec:22 Twp: 4S 65WFootage: 497 FSL  465 FEL
Log Types:CBL, MWD/LWD, (Triple Combination on 005-07471).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 104 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2321 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1157, Top: 0 ft., Bottom: 2321 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18117 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2195, Top: 1805 ft., Bottom: 18117 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX5324 ft.NN
SHANNON6230 ft.NN
SHARON SPRINGS7801 ft.NN
NIOBRARA7939 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2024                  Interval Top: 8487 ft.    Interval Bottom: 18088 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/13/2022Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/17/2021Treatment End Date:1/2/2022
Treatment Summary:Frac'd Niobrara with 53 stage plug and perf: 10531890 total lbs proppant pumped: 10137720 lbs 40/70 mesh and 394170 lbs 100 mesh. 438750 total bbls fluid pumped: 418566 bbls gelled fluid, 16398 bbls fresh water, and 3786 bbls 15% HCl acid.
Total fluid used in treatment (bbls):438750Max pressure during treatment (psi):8907
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:53
Total acid used in treatment (bbls):3786Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):155
Fresh water used in treatment (bbls):16398Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10531890Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8332 ft.
Tubing Packer Depth:8329 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/2/2022Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 91
BBLS_OIL 95
BTU_GAS 1387
CALC_BBLS_H2O 91
CALC_BBLS_OIL 95
CALC_GOR 2168
CALC_MCF_GAS 206
CASING_PRESS 1635
GRAVITY_OIL 43
MCF_GAS 206
TUBING_PRESS 2030
Perforation Data:
Interval Top:8487 ft.# Of Holes:2301
Interval Bottom:18088 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)29783
Total Gas Produced (MCF)183277
GOR6153
GOR DeterminationBOE
Average BOE per Day168.011
Average MCFE per Day974.469

 Federal Financial Assurance  i 

 Tribal Well  i No