|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/22/2022 Measured TD: 18088 ft. Vertical TD: 8154 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/22/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 1/22/2022 | Proposed Top PZ Location: | Sec:29 Twp: 4S 65W | Footage: 1800 FSL 460 FEL | Bottom Hole Location: | Sec:30 Twp: 4S 65W | Footage: 1800 FSL 460 FWL | Proposed Depth/Form: | 18028 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-1167 , Unit Acreage: 3840, Drill Unit: S. 17,18,19,20,29,30 | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 99 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 86, Top: 0 ft., Bottom: 99 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2304 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 1240, Top: 0 ft., Bottom: 2304 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18028 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2614, Top: , Bottom: 18028 ft. |
| | |
Wellbore Completed | Completion Date: | 7/10/2021 | Spud Date: | 6/8/2021 | Spud Date Is: | ACTUAL | Measured TD: | 18088 ft. | Measured PB depth: | 18049 ft. | True Vertical TD: | 8154 ft. | True Vertical PB depth: | 8155 ft. | Top PZ Location: | Sec:29 Twp: 4S 65W | Footage: 1824 FSL 464 FEL | Bottom Hole Location: | Sec:30 Twp: 4S 65W | Footage: 1797 S 465 W | Log Types: | CBL, MWD/LWD, Mud, (Triple Combo on 005-07270). | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 36, Top: 0 ft., Bottom: 104 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2374 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 1177, Top: 0 ft., Bottom: 2374 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18062 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2666, Top: 2250 ft., Bottom: 18062 ft., Determination Method: CBL | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 63 ft., Bottom: 63 ft., Sacks: 33, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | DENVER | 24 ft. | 1530 ft. | N | N | LARAMIE | 1530 ft. | 1877 ft. | N | N | FOX HILLS | 1877 ft. | 2095 ft. | N | N | PIERRE | 2095 ft. | 7925 ft. | N | N | NIOBRARA | 7925 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 11/22/2022 Interval Top: 8443 ft. Interval Bottom: 18037 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/14/2021 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 10/18/2021 | Treatment End Date: | 11/5/2021 | Treatment Summary: | Frac'd Niobrara with 53 stage plug and perf;
448090 total bbls fluid pumped: 424797 bbls gelled fluid, 19460 bbls fresh water, and 3833 bbls 15% HCl acid;
10763455 total lbs proppant pumped: 10361425 lbs 40/70 mesh and 402030 lbs 100 mesh. | Total fluid used in treatment (bbls): | 448090 | Max pressure during treatment (psi): | 9016 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 53 | Total acid used in treatment (bbls): | 3833 | Min frac gradient (psi/ft): | 0.89 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 8471 | Fresh water used in treatment (bbls): | 19460 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 10763455 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8053 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/21/2021 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 3657 | BBLS_OIL | 377 | BTU_GAS | 1431 | CALC_BBLS_H2O | 3657 | CALC_BBLS_OIL | 377 | CALC_GOR | 1538 | CALC_MCF_GAS | 580 | CASING_PRESS | 1500 | GRAVITY_OIL | 41 | MCF_GAS | 580 | TUBING_PRESS | 2000 |
| Perforation Data: | Interval Top: | 8443 ft. | # Of Holes: | 2304 | Interval Bottom: | 18037 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 24362 |
Total Gas Produced (MCF) | 132942 |
GOR | 5456 |
GOR Determination | BOE |
Average BOE per Day | 129.402 |
Average MCFE per Day | 750.566 |
Federal Financial Assurance | i | |
|
|