|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/11/2021 Measured TD: 18438 ft. Vertical TD: 7821 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/11/2021 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 10/22/2022 | | Proposed Top PZ Location: | Sec:28 Twp: 4S 65W | Footage: 360 FSL 330 FWL | | Bottom Hole Location: | Sec:27 Twp: 4S 65W | Footage: 360 FSL 330 FEL | | Proposed Depth/Form: | 18355 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-1255 , Unit Acreage: 1280, Drill Unit: Sections 27 & 28 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 99 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 86, Top: 0 ft., Bottom: 99 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2328 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 1253, Top: 0 ft., Bottom: 2328 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18355 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2671, Top: , Bottom: 18355 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/16/2021 | | Spud Date: | 6/7/2021 | Spud Date Is: | ACTUAL | | Measured TD: | 18438 ft. | Measured PB depth: | 18404 ft. | | True Vertical TD: | 7821 ft. | True Vertical PB depth: | 7821 ft. | | Top PZ Location: | Sec:28 Twp: 4S 65W | Footage: 345 FSL 330 FWL | | Bottom Hole Location: | Sec:27 Twp: 4S 65W | Footage: 361 FSL 335 FEL | | Log Types: | CBL, MWD/LWD, Mud, (Triple Combination on 005-07270). | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 104 ft., Weight: 42.09 , Citings Type: ACTUAL | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 104 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2384 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 1153, Top: 0 ft., Bottom: 2384 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18417 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2661, Top: 2200 ft., Bottom: 18417 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 26 ft., Bottom: 26 ft., Sacks: 11, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | DENVER | 24 ft. | 1500 ft. | N | N | | LARAMIE | 1500 ft. | 1800 ft. | N | N | | FOX HILLS | 1800 ft. | 2000 ft. | N | N | | PIERRE | 2000 ft. | 8044 ft. | N | N | | NIOBRARA | 8044 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 12/11/2021 Interval Top: 8495 ft. Interval Bottom: 18391 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/3/2021 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 10/18/2021 | Treatment End Date: | 10/27/2021 | | Treatment Summary: | 466061 bbls of water, 176 bbls of additives (FRP-22G, Bardac 2250M, T-Chlor 12.5, ACI-97, ASF-67) and 1991 bbl HCL in a 55 stage frac with 41486 Ibs of DFR-2S and 112199 lbs of silica quartz proppant
| | Total fluid used in treatment (bbls): | 468228 | Max pressure during treatment (psi): | 8805 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 55 | | Total acid used in treatment (bbls): | 1991 | Min frac gradient (psi/ft): | 0.86 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 3983 | | Fresh water used in treatment (bbls): | 466237 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8077 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/11/2021 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1841 | | BBLS_OIL | 945 | | BTU_GAS | 1405 | | CALC_BBLS_H2O | 1841 | | CALC_BBLS_OIL | 945 | | CALC_GOR | 669 | | CALC_MCF_GAS | 632 | | CASING_PRESS | 950 | | GRAVITY_OIL | 41 | | MCF_GAS | 632 | | TUBING_PRESS | 1600 |
| | Perforation Data: | | Interval Top: | 8495 ft. | # Of Holes: | 2393 | | Interval Bottom: | 18391 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 24425 |
| Total Gas Produced (MCF) | 38837 |
| GOR | 1590 |
| GOR Determination | BOE |
| Average BOE per Day | 85.321 |
| Average MCFE per Day | 494.846 |
| Federal Financial Assurance | i | |
|
|